No records
|
6211/2021 |
2021-03-31 |
Mt. Pleasant Organic
Farms Ltd |
1(a)(b), 14 |
the rearing of a maximum of 2500 heads of broilers per cycle and the slaughtering and packaging of broilers |
40 Roach Trace, Mt. Pleasant,
Tobago |
Status Update Letter 9-Sep-2022 |
|
|
6212/2021 |
2021-03-31 |
Tobago Green Pride
Farm |
1(a) |
the expansion of a livetock/poultry farm to facilitate the rearing of a maximum of 100 heads of goat and 200 heads of ducks |
Huntley Trace, Arnos Vale,
Tobago |
CEC ISSUED
07-Dec-2021 |
|
|
6213/2021 |
2021-04-01 |
EOG Resources Trinidad Limited |
24 |
crude oil in the SW Soldado Block through the drilling of two(2) open water exploration wells to a measured depth of 13,340ft to identify and quantify the potential reserves that can be developed as a commercial project
|
offshore , Southwest Coast, Trinidad |
CEC ISSUED
20-Dec-2021 |
|
|
6214/2021 |
2021-04-06 |
Primera Oil and Gas Limited |
24, 25, 26 (a), 27, 29 |
the construction of a multi-well surface facility with prefabricated meters and group separators flash separators, compressors and to install condensate and water tanks on the CASCADURA A wellsite with a total maximum capacity for storage of 8,800 bbls |
within the Ortoire Block |
CEC ISSUED
12-Aug-2022 |
|
|
6215/2021 |
2021-04-06 |
Assaf Ali |
1(a), 39 |
to rear in excess of 250 heads of poultry |
329 Cunjal Road, Barrackpore |
CEC ISSUED
20-May-2021 |
|
|
6216/2021 |
2021-04-06 |
Orange Grove Solar Limited |
8(a), 33 (a), 41(a) & (c) |
The development of a utility-scale solar photovoltaic (PV) project at Orange Grove including the clearing, excavation, grading or land filling of an area of more than two hectares
during a two-year period The establishment, modification or expansion (incl |
Orange Grove, Pasea Extension, |
CEC ISSUED
16-Jul-2021 |
|
|
6217/2021 |
2021-04-06 |
Stephen Khemraj |
1(a), 8 (a) (c) ,41 (a) |
rearing of poultry |
LP NO. 22/10, St. John Road, Brother's Road |
CEC ISSUED
20-May-2022 |
|
|
6218/2021 |
2021-04-07 |
Tucker Energy Services Limited [TESL] |
18(b) |
the decomissioning of a bulk cement storage plant and associated infrastructure |
Labidco Industrial Estate, La Brea
|
CEC ISSUED
05-May-2021 |
|
|
6219/2021 |
2021-04-07 |
Heritage Petroleum Company Limited |
25 |
the abandonment of Well ALM 13 which is no longer on production, but is located near shore
and along navigational routes for marine vessels. |
Coastal Nearshore |
CEC ISSUED
04-May-2021 |
|
|
6220/2021 |
2021-04-08 |
Mitsubishi Heavy Industries Ltd |
42 |
to deactivate aerobic treatment units used during the construction phase of the TMD project |
Lot #2A Union Industrial Estate, Vessigny Village, La Brea |
CEC ISSUED
09-Jun-2021 |
|
|