Print

CEC Summary

6214/2021
2021-04-06
Primera Oil and Gas Limited
24, 25, 26 (a), 27, 29
the construction of a multi-well surface facility with prefabricated meters and group separators flash separators, compressors and to install condensate and water tanks on the CASCADURA A wellsite with a total maximum capacity for storage of 8,800 bbls
within the Ortoire Block
Final TOR L 27-Jul-2021 TOR L. 28-May-2021 Deter. L 17-May-2021 Ack/Det.l 22-Arp-2021