Print
CEC Summary
6216/2021
2021-04-06
Orange Grove Solar Limited
8(a), 33 (a), 41(a) & (c)
The development of a utility-scale solar photovoltaic (PV) project at Orange Grove including the clearing, excavation, grading or land filling of an area of more than two hectares
during a two-year period The establishment, modification or expansion (incl
during a two-year period The establishment, modification or expansion (incl
Orange Grove, Pasea Extension,
CEC ISSUED
16-Jul-2021