CEC Ref # Date Received Applicant Activity Description Location Status
Page 622 of 646 Total: 6451
  • Start
  • Prev
  • 617
  • 618
  • 619
  • 620
  • 621
  • 622
  • 623
  • 624
  • 625
  • 626
  • Next
  • End
1(a)(b), 14(1)
No records
6211/2021 2021-03-31 Mt. Pleasant Organic Farms Ltd 1(a)(b), 14 the rearing of a maximum of 2500 heads of broilers per cycle and the slaughtering and packaging of broilers Ack./F.I. 16-Apr-2021
View
1(a)(1)
No records
6212/2021 2021-03-31 Tobago Green Pride Farm 1(a) the expansion of a livetock/poultry farm to facilitate the rearing of a maximum of 100 heads of goat and 200 heads of ducks CEC ISSUED 07-Dec-2021
View
24(1)
No records
6213/2021 2021-04-01 EOG Resources Trinidad Limited 24 crude oil in the SW Soldado Block through the drilling of two(2) open water exploration wells to a measured depth of 13,340ft to identify and quantify the potential reserves that can be developed as a commercial project
CEC ISSUED 20-Dec-2021
View
24, 25, 26 (a), 27, 29(1)
No records
6214/2021 2021-04-06 Primera Oil and Gas Limited 24, 25, 26 (a), 27, 29 the construction of a multi-well surface facility with prefabricated meters and group separators flash separators, compressors and to install condensate and water tanks on the CASCADURA A wellsite with a total maximum capacity for storage of 8,800 bbls Delay Letter 24-May-22
View
1(a), 39(1)
No records
6215/2021 2021-04-06 Assaf Ali 1(a), 39 to rear in excess of 250 heads of poultry CEC ISSUED 20-May-2021
View
8(a), 33 (a), 41(a) & (c)(1)
No records
6216/2021 2021-04-06 Orange Grove Solar Limited 8(a), 33 (a), 41(a) & (c) The development of a utility-scale solar photovoltaic (PV) project at Orange Grove including the clearing, excavation, grading or land filling of an area of more than two hectares
during a two-year period The establishment, modification or expansion (inclusive of associated works) of a land
drainage or irrigation scheme for a parcel of land or more than 1 hectare during a two-year
period; the realignment or modification of drainage or river systems.
CEC ISSUED 16-Jul-2021
View
1(a), 8 (a) (c) ,41 (a)(1)
No records
6217/2021 2021-04-06 Stephen Khemraj 1(a), 8 (a) (c) ,41 (a) rearing of poultry CEC ISSUED 20-May-2022
View
18(b)(1)
No records
6218/2021 2021-04-07 Tucker Energy Services Limited [TESL] 18(b) the decomissioning of a bulk cement storage plant and associated infrastructure CEC ISSUED 05-May-2021
View
25(1)
No records
6219/2021 2021-04-07 Heritage Petroleum Company Limited 25 the abandonment of Well ALM 13 which is no longer on production, but is located near shore
and along navigational routes for marine vessels.
CEC ISSUED 04-May-2021
View
42(1)
No records
6220/2021 2021-04-08 Mitsubishi Heavy Industries Ltd 42 to deactivate aerobic treatment units used during the construction phase of the TMD project CEC ISSUED 09-Jun-2021