6031/2020 |
|
Primera Oil and Gas Limited |
|
The establishment of a six-inch diameter natural gas pipeline, 3 kilometers in length from the COHO-1 wellsite to the Shell Baraka Facility and the installation of a pre-fabricated meter, gas separator unit, flare stack and storage tanks with a maximum capacity of 1600 barrels at the COHO-1 wellsite |
within the Ortoire and Central Blocks |
CEC ISSUED
22-Jan-2021 |
|
|
6039/2020 |
|
Rajkumar Maharaj |
|
to re-establish cocoa and coffee plantation with an irrigation system |
Amazon Road, Wallerfield, Arima |
NO CEC Required
28-Jul-2020 |
|
|
6040/2020 |
|
Dr. Olubunmi Oridota c/o Bynoe Rowe Wiltshire Partnership |
|
the clearing, excavation, grading and filling of land with a gradient of 1:4 or more to facilitate the establishment of a single family residence |
1 Hilltop Drive, Percy Place, Carenage |
CEC ISSUED
09-Feb-2021 |
|
|
No records
|
6032/2020 |
|
Reshco Transport Ltd |
23 |
the establishment of a facility for the mining & Processing of non-metallic minerals |
4MM Blanchiseusse Road, Vale, Arima |
Resp. Ext. Request
13-Nov-2020 |
|
|
6033/2020 |
|
Barrat Mangalsingh |
23 |
the establishment of a facility for the mining red sand from 1.3446 hectares of land |
L.P # 2088 Southern Main Road, Chatum Cedros |
Status Update Letter
03-Oct-2023 |
|
|
6035/2020 |
|
Ricky Raghunanan Ltd c/o Chanan Motilal |
23 |
the establishment of a facility for the mining and processing of sand and gravel on 16.197ha of land |
|
CEC ISSUED 09-Dec-2021 |
|
|