6031/2020
2020-07-14
Primera Oil and Gas Limited
8(a)(b), 25, 27, 29, 41©
The establishment of a six-inch diameter natural gas pipeline, 3 kilometers in length from the COHO-1 wellsite to the Shell Baraka Facility and the installation of a pre-fabricated meter, gas separator unit, flare stack and storage tanks with a maximum ca
within the Ortoire and Central Blocks
CEC ISSUED
22-Jan-2021