Toggle Navigation
CEC Summary
EIA Summary
FOI Request
Information Centre Requests
General Request
National Register Request
Tobago - CEC Summary
CEC Summary
Toggle
CEC Summary
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Group by
None
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Clear filters
Advanced search
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
the laying of water main through the installation of 1.6km of 150mm Polyvinyl Chloride (PVC) pipeline and its appurtenances including bridge/culvert crossings and road reinstatement
(1)
No records
5710/2019
2019-03-18
WASA c/o Roger Karim
40(b)
the laying of water main through the installation of 1.6km of 150mm Polyvinyl Chloride (PVC) pipeline and its appurtenances including bridge/culvert crossings and road reinstatement
from the corner of Bagatelle Road and Sea Trace to the corner of North Post Road and Sea Trace along Sea Trace, Diego Martin
CEC ISSUED 12-Apr-2019
View
the clearing, cutting and grading of with a gradient of 1:4 or more to facilitate the construction of a multi-family residence
(1)
No records
5711/2019
2019-03-19
IDS Designs Ltd.
8©
the clearing, cutting and grading of with a gradient of 1:4 or more to facilitate the construction of a multi-family residence
Lot # 80, Corner of Saddle Rd. & La Saiva Terrace
Ack./F.I. 02-Apr-2019
View
diversion of a segment of the Wrightson Road/Westmoorings 66 kV #1 & #2 circuits from the Mucurapo Road to the Western embankment of the Bournes Road river reserve and along the southern side of the Audrey Jeffers Highway utilising a series of poles and m
(1)
No records
5712/2019
2019-03-19
T&TEC
diversion of a segment of the Wrightson Road/Westmoorings 66 kV #1 & #2 circuits from the Mucurapo Road to the Western embankment of the Bournes Road river reserve and along the southern side of the Audrey Jeffers Highway utilising a series of poles and m
Mucurapo Main Road & Audrey Jeffers Highway
NO CEC Required 2-Apr-2019
View
the commissioning and operation of a sulphuric acid plant
(1)
No records
5713/2019
2019-03-20
Castalloy Company Ltd.
20 (a)
the commissioning and operation of a sulphuric acid plant
LP 75 North Sea Drive Pt. Lisas Industrial Estate, Savonetta
CEC ISSUED 12-Jun-2019 Gen. Letter 26-Aug-2019
View
the expansion of an existing tank farm faciity for the storage of drilling muds, completion fluids and brine including the clone replacement of a 1000 barrel storage tank
(1)
No records
5714/2019
2019-03-20
Schlumberger Trinidad Inc.
36
the expansion of an existing tank farm faciity for the storage of drilling muds, completion fluids and brine including the clone replacement of a 1000 barrel storage tank
First Street South, Chaguaramas
CEC ISSUED 02-Sep-2019
View
export of scrap aluminium to Miami
(1)
No records
5715/2019
2019-03-21
Caribbean Glass Specialists Ltd
37
export of scrap aluminium to Miami
49-55 Eastern Main Road, Barataria
NO CEC Required 26-Mar-2019
View
The laying of a Water Main through the installation of 1.2km of 120mm PVC pipeline and its appurtenances including bridge/culvert crossing and road reinstatement
(1)
No records
5716/2019
2019-03-21
WASA c/o Roger Karim
40(a)
The laying of a Water Main through the installation of 1.2km of 120mm PVC pipeline and its appurtenances including bridge/culvert crossing and road reinstatement
from Foncette Road to Mon ReposVillage along Cascade Road
CEC ISSUED 17-Apr-2019
View
the establishment of infrastructure for pipeline systems
(1)
No records
5717/2019
2019-03-25
National Gas Company of Trinidad and Tobago Limited (NGC)
27
the establishment of infrastructure for pipeline systems
Union Gas Receiving Facility, Union Industrial Estate, Vessigny Village, La Brea
FILE CLOSED 24-May-2019
View
the installation of 2700m of 300mm ductile iron pipe inclusive of installation of associated appurtenances, interconnection, bridge and culvert crossings
(1)
No records
5718/2019
2019-03-25
WASA c/o Roger Karim
40(b)
the installation of 2700m of 300mm ductile iron pipe inclusive of installation of associated appurtenances, interconnection, bridge and culvert crossings
from Piarco Plaza to Maloney Junction for a distance of 2700m along the verge of the Churchill Roosevelt Highway
CEC ISSUED 27-May-2019
View
the operation of a facility for the reshaping of Polyvinyl Chloride (PVC) Pipes in to long radius (LR) bends
(1)
No records
5719/2019
2019-03-25
Hardeo Dookram t/a Sunrise Enterprises
20©
the operation of a facility for the reshaping of Polyvinyl Chloride (PVC) Pipes in to long radius (LR) bends
8 Rickson Street, El Dorado Village
NO CEC Required 10-Jun-2019
View
You are here:
Home