Print

CEC Summary

5718/2019
2019-03-25
WASA c/o Roger Karim
40(b)
the installation of 2700m of 300mm ductile iron pipe inclusive of installation of associated appurtenances, interconnection, bridge and culvert crossings
from Piarco Plaza to Maloney Junction for a distance of 2700m along the verge of the Churchill Roosevelt Highway
CEC ISSUED 27-May-2019