EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 627 of 652 Total: 6514
  • Start
  • Prev
  • 622
  • 623
  • 624
  • 625
  • 626
  • 627
  • 628
  • 629
  • 630
  • 631
  • Next
  • End
Division of Infractstucture, Quarries and the Environment, Tobago House of Assembly(1)
No records
6261/2021 2021-07-28 Division of Infractstucture, Quarries and the Environment, Tobago House of Assembly 13 (a) the establishment of a temporary jetty to facilitate the continued livelihood of all marine stakeholders who now used the compromised Parlatuvier Jetty Jetty Street,
Parlatuvier, Tobago
CEC ISSUED 17-Aug-2021
View
Ian Williams(1)
No records
6262/2021 2021-07-28 Ian Williams 1 (a & b), 14 (a) Establishment of a Poultry Farm LP#3,95 Spring Garden Trace,
Plymouth Road,
Tobago
Ack/F.I. 11-Aug-2021
View
United Independent Petroleum Marketing Company Limited (UNIPET)(1)
No records
6263/2021 2021-08-03 United Independent Petroleum Marketing Company Limited (UNIPET) 29 and 43 (a) the tanks and compressors associated with the compressed natural gas(CNG) fueling at UNIPET's Brentwood Gas Station is approaching the end of its useful life. As such UNIPET proposes to remove these items and replace them with new units. Corner North Brentwood Gardens and Edinburgh Boulevard,
Chaguanas
No CEC Required 1-Dec-2021
View
Piranha International Limited(1)
No records
6264/2021 2021-08-03 Piranha International Limited 36, 37 The establishment of a Facility for the Storage, Recycling and Disposal of Electronic
Waste (eWaste) and Plastic Waste.
Gasparillo By-Pass Road
Reform
CEC ISSUED 1-June-2022
View
Agora Estate LTD.(1)
No records
6265/2021 2021-08-03 Agora Estate LTD. 8 (a&b), 9,10 (a), 40 (a &b), 41 (a & b), 42 to develop a multi-family residential site Settlement A Tumpuna Road Cumuto Village 2nd Clarification Letter 1-July-2022
View
WASA (2)
No records
6266/2021 2021-08-09 WASA 38 (b) & 40 (a) Drilling, developing and equipping of the Cap-de-Ville Well #5 for production status and the installation of 1.2km of PVC transmission pipeline inclusive of associated appurtenances from the proposed well to interconnect at the existing Cap-de-Ville Well ͒䏈 Cap-de-Ville/Point Fortin.
SS Erin Road
CEC ISSUED 03-Sep-2021
View
6267/2021 2021-08-10 WASA 42 The refurbishment of the existing Harmony Hall WWTP so as to ensure that it can effectively treat the incoming flows to a level that is in compliance with the Water Pollution Rules, 2019. IDC Industrial Estate,
Harmony Hall,
Marabella
Ack/Det 23-Aug-2021
View
Urban Development Corporation of Trinidad and Tobago (UDeCoTT)(1)
No records
6268/2021 2021-08-10 Urban Development Corporation of Trinidad and Tobago (UDeCoTT) 8 ( b) ,9 ,12, 13 (a,c) 31 (a), 33 (a,c), 43© The Reclamation of Land at the Port of Spain Foreshore Port of Spain Ack/F.I. 23-Aug-2021
View
National Gas Company of Trinidad and Tobago(1)
No records
6269/2021 2021-08-10 National Gas Company of Trinidad and Tobago 26 (a) Removal of all Metering Station infrastructure and isolation of the existing 16" natural gas pipelines to the Powergen POS Metering facilities to facilitate planned road works along Wrightson Road 6A Queen's Park West,
Port of Spain
CEC ISSUED 17-Sep-2021
View
Solid Waste Management Company of Trinidad and Tobago(1)
No records
6270/2021 2021-08-12 Solid Waste Management Company of Trinidad and Tobago 13 (a) To undertake a coastal erosion mitigation pilot project using Cemsurt technology at either of the following sites:
1. Moruga new fishing facility at Gran Chemin Beach
2. Moruga existing fising facility at Gran Chemin Beach
3. Moruga existing Beach Facilit͒䏈睙尘睨
Gran Chemin Beach/ La Rufin Beach Application Withdrawn 10-Nov-2021
View
  • You are here:  
  • Home

Back to Top

© 2023 EMA E-Summary