Print

CEC Summary

6266/2021
2021-08-09
WASA
38 (b) & 40 (a)
Drilling, developing and equipping of the Cap-de-Ville Well #5 for production status and the installation of 1.2km of PVC transmission pipeline inclusive of associated appurtenances from the proposed well to interconnect at the existing Cap-de-Ville Well
Cap-de-Ville/Point Fortin.
SS Erin Road
CEC ISSUED 03-Sep-2021