6184/2021 |
2021-02-23 |
Primera Oil and Gas Limited |
25, 26(a), 27 |
the drilling, completion and extended testing of four (4) oil and gas development wells from CASCADURA-B site and the construction of a buried 10-20 inch Natural Gas pipeline FROM CASCADURA-B to the main facility at CASCADURA-1ST1 wellsite |
within the Ortoire Blocks |
Application Withdrawn
10-May-2021
|
|
|