Print
CEC Summary
6184/2021
2021-02-23
Primera Oil and Gas Limited
25, 26(a), 27
the drilling, completion and extended testing of four (4) oil and gas development wells from CASCADURA-B site and the construction of a buried 10-20 inch Natural Gas pipeline FROM CASCADURA-B to the main facility at CASCADURA-1ST1 wellsite
within the Ortoire Blocks
Application Withdrawn
10-May-2021