6350/2022 |
2022-01-13 |
Division of Food Production, Forestry and Fisheries, Tobago House of Assembly |
31 |
Establishment of parks, nature trails and other recreational activities |
Goldsborough, Tobago |
Withdrawal Letter 31-October-2023 |
|
|
6351/2022 |
2022-01-18 |
Mrs. Sonia Fracis- Yearwood, Ministry of Works and Transport |
8, 9 (a) |
The elimination of three (3) signalized at grade intersections along the existing Churchhill Roosevelt Highway (CRH) through the construction of an interchange approximately 500 metres of East of the existing Macoya Road and CRH intersection, the widening |
Macoya |
Extension Letter 05-April-2024 |
|
|
6352/2022 |
2022-01-18 |
Ardennes Homes Ltd |
8(a), 9, 33(a), 38(b), 40(a), 41(a)(b) and 42
|
Residential Development
|
Carapo, Arima |
CEC ISSUED 13-May-2022 |
|
|
6353/2022 |
2022-01-18 |
WASA |
38 (b) |
Drilling, developing and equipping of the Balmain Well #2 for production status. |
Rivulet Road, Balmain, Couva |
CEC ISSUED 4-Mar-2022 |
|
|
6354/2022 |
2022-01-21 |
Massy Distribution |
TBD |
To destroy expired bonded liquor |
Corner Macoya Rd and Churchill Roosevelt Highway |
Clarification Letter 16-May-2022 |
|
|
6355/2022 |
2022-01-27 |
BPTT |
27, 29 |
Construction of a new 500,000 bbls capacity storage tank and Replacement of the 42-inch piping that is utilized to transfer product from the storage tanks to the loading pumps at bp Trinidad and Tobago (bpTT) Galeota Point Terminal facility. |
Mayaro
|
CEC ISSUED 17-Oct-2022 |
|
|
6356/2022 |
2022-01-28 |
Naresh Samlal |
3 |
Establishment of a 0.42 hectare pond for fish propagation. |
Wallerfield, Arima
|
CEC ISSUED 20-May-2022 |
|
|
6357/2022 |
2022-02-01 |
TTEC c/o WSP Caribbean Ltd.
|
40 (A) 41(A) 42 |
construction of a new facility that will provide an improved functional layout for the Distribution East Department. The facility is to be developed as two (2) building |
Corner of Richard's Trace & Tumpuna Road Arima
|
CEC ISSUED 13-May-2022 |
|
|
6358/2022 |
2022-02-02 |
Gowrie Parsadsingh Contracting Company Ltd |
18 |
Establishment of a concrete batching plant |
280 Jeffers Crossing Tabaquite Road Rio Claro |
CEC ISSUED 28-July-2023 |
|
|
6359/2022 |
2022-02-03 |
APR Associates Limited |
N/A |
Construction and operation of 2 story commercial building for the primary purpose of rental space for retail sales |
Lot B 237 Western Main Road
Cocorite |