Print
Construction of a new 500,000 bbls capacity storage tank and Replacement of the 42-inch piping that is utilized to transfer product from the storage tanks to the loading pumps at bp Trinidad and Tobago (bpTT) Galeota Point Terminal facility.
Mayaro
CEC Summary
6355/2022
2022-01-27
BPTT
27, 29
Construction of a new 500,000 bbls capacity storage tank and Replacement of the 42-inch piping that is utilized to transfer product from the storage tanks to the loading pumps at bp Trinidad and Tobago (bpTT) Galeota Point Terminal facility.
Mayaro
CEC ISSUED 17-Oct-2022