The development of a utility-scale solar photovoltaic (PV) project at Orange Grove including the clearing, excavation, grading or land filling of an area of more than two hectares
during a two-year period The establishment, modification or expansion (inclusive of associated works) of a land
drainage or irrigation scheme for a parcel of land or more than 1 hectare during a two-year
period; the realignment or modification of drainage or river systems.