Print

CEC Summary

5852/2019
2019-08-27
BPTT LLC
26(a), 27
the modification of an existing natural gas processing facility to include a 914.4mm (36 inch) above ground by-pass pipeline, 52m in length and associated infrastructure
Beachfield Terminal Facility, Isthmus Road, Guyaguyare,
Mayaro
CEC ISSUED 27-Nov-2019