CEC Summary
id
5853
CEC Ref #
5852/2019
Date Received
2019-08-27
Applicant
BPTT LLC
Activity
26(a), 27
Description
the modification of an existing natural gas processing facility to include a 914.4mm (36 inch) above ground by-pass pipeline, 52m in length and associated infrastructure
Location
Beachfield Terminal Facility, Isthmus Road, Guyaguyare,
Mayaro
Status
CEC ISSUED 27-Nov-2019
files
file list