CEC Summary
id
6187
CEC Ref #
6186/2021
Date Received
2021-03-01
Applicant
Brechin Castle Solar Limited
Activity
7, 8(a), 33 (a), 41(a)
Description
the establishment of a utility scale photovoltaic (PV) facility with an operational capacity of 92.22 megawatt (MW) on 238.24 ha of land
Location
Sites 1A, 2A and 6A, Brechin Castle, Couva
Status
CEC ISSUED 20-Jul-2021
files
file list