CEC Summary

6079/2020
2020-09-10
Water and Sewerage Authority (WASA)
38(b)
the drilling, developing and equipping of the Palo Seco #10 well for production status and the installation of a 500m of a 100mm Polyvinyl Chloride pipeline and its appurtenances
Carapal Road, Palo Seco
CEC ISSUED 30-Nov-2020