CEC Ref # Date Received Applicant Activity Description Location Status
Page 44 of 48
  • Start
  • Prev
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • Next
  • End
6675/2023(1)
No records
6675/2023 2023-06-20 WASA 40 (b) Installation of a total of 3.68km of PVC Main and their appurtenances including road reinstatement From Hillsborough West Water Treatment Plant along the Belmont Road for 2.1km and along Road Reserve off the Belmont Road for 1.58km, Belmont Road, Tobago CEC ISSUED 09-August-2023
View
6683/2023(1)
No records
6683/2023 2023-06-29 WASA 40 (b) Installation of a total of 1.6km PVC Main and its appurtenances including road reinstatement. from cor of lammy road and Douglas Trace to 1600m along Lammy Estate. Lammy Road, Argyle, Tobago CEC ISSUED 09-August-2023
View
6692/2023(1)
No records
6692/2023 2023-07-11 Southern Caribbean Fiber Ltd. 13 (c) Facilitate the installation of the DeepBlue One Submarine Cable System between Trinidad and Tobago (and onwards to Guyana, Suriname, French Guiana) inclusive is minor shore end land works consisting of construction of a concrete headwall and beach manhole Trinidad - Staubles Bay to CDA head office via Western Main Rd, Tobago - Rockly Bay to SCF Cable Landing Station via Milford Rd Ack/FI Letter 25-July-2023
View
6704/2023(1)
No records
6704/2023 2023-07-25 The Institute of Marine Affairs (IMA)  13(a), 43 (b) For the establishment of the IMA Tobago Field Station/Office )approx 10,00 sq. ft. 2-storey building) at Pigeon Point, Tobago. (inclusive of a slipway). The propsoed field station will have a wet/dry microbiology lab, coral research area, boatshed, 4-bedr Off Pigeon Point Road (Pigeon Point Heritage Park) Tobago 2nd Clarifcation Letter 16-November-2023
View
6706/2023(1)
No records
6706/2023 2023-07-27 International Projects Initiatives Ltd. c/o Sebastien Paddington 8, 41 Excavation and grading of existing river embankment above the high-water mark. Installation of rock stabilization along river edge to enhance and protect existing embankment from erosion whilst ensuring negative impacts or no damage to the existing river lots #120 & 121 Hope Estate, Parish of St. George, Tobago Ack/FI Letter 17-August-2023
View
6709/2023(1)
No records
6709/2023 2023-08-10 Trinidad and Tobago National Petroleum Marketing Company Limited 43(a) The renovation and operationalization of a dormant gas station site Corner Milford road and Smithfield Crown Trace, Scarborough, Tobago Status Update Letter 20-Feb-2024
View
6716/2023(1)
No records
6716/2023 2023-08-22 Anthobella Real Estate Services Ltd. 8 (a) Land Development for Residential Lots Mt. Pelier Plymouth Road, Bamboo Gully, Tobago Ack/FI Letter 05-Sept-2023
View
6718/2023(1)
No records
6718/2023 2023-08-24 Anthony Williams  8, 41, 11 Sports Facility to promote Health and Wellness with a primary focus on raquet sports (tennis, table tennis, squash) with living accommodation in the form of an up to 30 room hotel and individual villas. Orange Hill Trace, Mary's Hill, Plymouth Ack/FI Letter 11-Sept-2023
View
6721/2023(1)
No records
6721/2023 2023-08-28 Biostratigraphic Associates (Trinidad) Ltd. 24 Conduct a three dimensional multi client seismic survey offshore of Trinidad and Tobago Offshore 2nd Ext. Req. Resp Letter 22-Dec-2023
View
6730/2023(1)
No records
6730/2023 2023-09-08 Owen Smith Construction LTD 41,43 Establishment of land drainage and irrigation schemes and provision of other service-oriented activities Lammy Road, Argyle Tobago Ack/FI Letter 21-Sept-2023