0955/2005 |
2005-01-25 |
Eastern Caribbean Gas Pipeline Company Limited |
27 |
The conduct of geotechnical and geophysical survey |
Cove Estate, South Coast Tobago. |
CEC ISSUED:
9-May-2005 |
|
|
3490/2012 |
2012-05-10 |
Eastern Caribbean Gas Pipeline Company Limited c/o Clyde R. Williams |
27 |
The conducting of geophysical and geotechnical deep water seabed surveys |
from the marine area offshore Cove Point, Tobago to the maritime boundary with Barbados |
CEC ISSUED 18-Jul-2012 |
|
|
4847/2016 |
2016-05-05 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
To establish 2km of 6inch diameter pipeline and a metering station to NPMC Service station |
Milfors Road, Lowlands, Tobago |
Application Withdrawn 8-Oct-2021 |
|
|
5166/2017 |
2017-05-03 |
The National Gas Company (NGC) |
27 |
Collection of natural gas liquids (condensate) from NGC facility for transportation to Trinidad for disposal |
Cove Estate Tobago |
CEC ISSUED
29-Mar-2019 |
|
|
5374/2018 |
2018-01-18 |
National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
The establishment of a 102mm (4-inch) diameter natural gas pipeline , 70.34m in length, a pre-fabricated metering station and the abandonment-in-place of an existing 50-mm (2-inch) diameter natural gas pipeline |
University of Trinidad and Tobago (UTT), Wallerfield Campus, Wallerfield |
CEC ISSUED
06-Mar-2018 |
|
|
5681/2019 |
2019-02-11 |
Trinidad and Tobago National Petroleum Marketing Company Limited (TTNPMC) |
27 |
the installation of a subsea pipelines and the decommissioning and removal of inactive lines from the shoreline at an existing fuel receiving terminal |
L.P NO. 11 Light House Road Crown Point Tobago |
CEC ISSUED
06-Aug-2019 |
|
|
6063/2020 |
2020-08-13 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
the replacement and upgrade of an existing natural gas metering station |
National Energy Corporation of Trinidad and Tobago Limited's Compound, Corner Rivulet and Factory Roads, Brechin Castle, Couva |
CEC ISSUED
23-Sep-2020 |
|
|
6100/2020 |
2020-10-06 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
The installation of a 50.8 mm (2-inch) natural gas pipeline, 135 m in length |
from the tie-in point at the National Gas Company of Trinidad and Tobago Limited’s existing 102/76 mm (4/3-inch) pipeline along the Priority Bus Route to Caribbean Packaging Industries Located at Champ Fleurs |
CEC ISSUED
09-Apr-2021 |
|
|