No records
|
6822/2024 |
2024-02-21 |
Helen Simon |
8c |
To clear, excavate, grade and fill land for construction of 3149.1M^2 of land with a gradient of 1:4 or more at windward road, Belle Garden Tobago |
Windward Main Road, Belle Garden |
Ack/FI Letter 4-Mar-2024 |
|
|
6824/2024 |
2024-02-23 |
Warner Construction and Sanitation Limited |
18 |
The Establishment of a dry mix concrete batching plant on 0.6 Hectares of land at the Cove Estate, Canoe Bay, Tobago |
COVE, Canoe Bay, Caanan, Tobago |
Ack/FI Letter 8-Mar-2024 |
|
|
6836/2024 |
2024-03-01 |
National Infrastructure Development Company Limited (NIDCO) |
18 (a) |
The establishment of a dry mix concrete batching plant on 4000 square metres of land within the project site for the new terminal building for the ANR Robinson International airport |
County St. Patrick, Crown Point, Tobago |
Ack/FI Letter 14-Mar-2024 |
|
|
6860/2024 |
2024-04-12 |
Institute of Marine Affairs |
N/A |
To restore coral reefs in Speyside and Charlotteville, North East Tobago. |
North East Tobago - Speyside (primarily), Charlotteville (secondarily) |
NO CEC Required 25-March-2024 |
|
|
6865/2024 |
2024-04-29 |
Shazim Ali |
8 (a) 9, 33 (a), 41 (a) |
The clearing, excavation, filling anf establishment of drainage and associated infrastructure on 3.4542 hectares of land to facilitate the establishment of a residential development. |
Crown Point |
2nd Clarification Letter 24-Dec-2024 |
|
|
6866/2024 |
2024-04-29 |
Project Management and Real Estate Consultancy Services Ltd |
6, 8 (a) (b) (c), 33 (a), 41 (a) |
The clearing, grading, excavation, filling and establishment of drainage for the purpose of a crop farming on 2 hectares of a 4 hectare parcel of land with a gradient of 1:4 or more at Arnos Vale Main road. |
Arnos Vale, Tobago |
Ack/FI Letter 10-May-2024 |
|
|
6879/2024 |
2024-05-20 |
Dickson Wight |
1 (a) |
The expansion of an exisiting poultry farm for the rearing of layers from 300 heads to a maximum of 500 heads per cycle at #73 Mt. Hay Trace, Patience Hill, Tobago |
73 Mt Hay Trace L.P. #T5007204LEO, Patience Hill, Tobago |
Ack/FI Letter 29-May-2024 |
|
|
6906/2024 |
2024-06-26 |
Owen Construction LTD |
TBD |
Drilling, development and equipping of wells |
Lammy Road, Argyle Tobago |
CEC ISSUED 12-September-2024 |
|
|
6931/2024 |
2024-07-25 |
Dheilan Phillips |
8 (a), 9, 41 (a) |
The survey and subdivision of 2.2 hectares of land to facilitate residential development. |
Canaan Farm Road, Tobago |
NO CEC Required 15-October-2024 |
|
|
6949/2024 |
2024-08-21 |
Warn's Quarry Company Limited |
23 |
The processing of Sand and Gravel on 16.66 hectares of land |
Moonan Road, Wallerfield |
Ack/FI Letter 05-September-2024 |
|
|