No records
|
6605/2023 |
2023-02-23 |
Reon Lyons |
1(a) |
Poultry Farming |
#174 Riseland Road Tobago |
CEC ISSUED 15-May-2023 |
|
|
6610/2023 |
2023-03-03 |
Alwin Mohammed |
13 (a) |
Coastal protection works at residential property to mitigate and prevent further ongoing coastal erosion due to seawater wave activity |
Lot 127, Plantation Villas, Lowlands, Tobago |
Clarification Letter 07-Feb-2024 |
|
|
6616/2023 |
2023-03-14 |
Carron Rivers |
8 |
The grading of a portion of land with a gradient od 1:4 or more and the Installation of Drainage |
Plymouth Road, Whim, Tobago |
CEC ISSUED
15-September-2023 |
|
|
6641/2023 |
2023-04-20 |
Kalonji Oneil |
1 (a) 8 (c) |
Clearing and Removal of material on land for the development of a chicken farm |
#16 Providence Road Scarborough, Tobago |
CEC ISSUED
28-July-2018 |
|
|
6643/2023 |
2023-04-24 |
John Mapp |
8 (c) |
Construction of banks/terraces to improve access to land |
Richmond Bay Road & Richmond Point, Tobago |
Status Update Letter 19-Feb-2024 |
|
|
6644/2023 |
2023-04-24 |
Sabrina Pietzsch-La Borde |
5 (b), 6, 8 (a,b,c), 33 (a) |
Re-establishment of existing roads, expansion of new roads and interconnecting roads. Clearance for establishment of agricultural fields. Establishment of tourist tracks. Felling and Removal of trees for above mentioned establishments. Removal of top soil |
Arden Estate, Roxsborough, St. Paul, Tobago |
Status Update Letter 23-Feb-2024 |
|
|
6654/2023 |
2023-05-12 |
Black Rock Dreams Management LTD |
13 (a) |
To repair coastal rip rap wall and coastline stabalization. |
#35 Old Grafton Road, Black Rock, Tobago |
CEC ISSUED 21-August-2023 |
|
|
6663/2023 |
2023-05-24 |
Anselm Robley |
8 (a) (b) |
Clearing, excavation |
11 LP, Main Road, Argyle Village, Tobago. |
Clarification Letter 21-Sept-2023 |
|
|
6667/2023 |
2023-06-01 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
37 |
Incineration od Liquid Hydrocarbons at NGC Gas Receiving Facility at Cove Tobago Eco- Industrial and Business Park, Canoe Bay Road, Tobago |
Cove Tobago Eco-Industrial and Business Park, Canoe Bay Road, Tobago |
Response to extension request 04-Mar-2024 |
|
|
6672/20223 |
2023-06-15 |
Division of Infrastructure Quarries and Urban Development |
9 (a,b), 33 |
Construction of a 2.5km flexible pavement, single carriageway |
Friendship Estate, South West, Tobago |
CEC ISSUED 6-September-2023 |
|
|