No records
|
6023/2020 |
2020-07-02 |
Indra Ramcharan |
8(a), 40(a), 41(a) |
the establishment of infrastructure to facilitate a residential development on 12.946 hectares of land inclusive of drainage, roadways and water distribution systems |
LP 19, Orange Hill Road, Tobago |
CEC ISSUED
28-Dec-2020 |
|
|
6028/2020 |
2020-07-09 |
Inez Investments Ltd. c/o Allan Warner |
13(b) |
the establishment of a breakwater structure |
Granby Point, Fort Granby,
Tobago |
CEC ISSUED
11-Jun-2021 |
|
|
6029/2020 |
2020-07-09 |
Division of Infrastructure,
Quarries and the Environment |
8(c), 9, 33(b) |
the strategic widening of the existing roadway |
Turpin Bend, Windward Road, Charlotteville, Tobago |
CEC ISSUED
25-Sep-2020 |
|
|
6047/2020 |
2020-07-24 |
Alex N. Melville c/o Atlantic View agro |
1(a) |
the expansion of a poultry farm for the rearing
of layers |
390 A Windward Main Road,
Goodwood, Tobago |
No CEC Required
10-Oct-2022 |
|
|
6063/2020 |
2020-08-13 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
the replacement and upgrade of an existing natural gas metering station |
National Energy Corporation of Trinidad and Tobago Limited's Compound, Corner Rivulet and Factory Roads, Brechin Castle, Couva |
CEC ISSUED
23-Sep-2020 |
|
|
6085/2020 |
2020-09-18 |
Coastal Technologies
Limited |
8,9,12, 13, 14(a), 18(b), 29, 31(a), 33(a)(b), 34, 35, 38 ©, 40(a), 41(a), 42, 43(a)(b)© |
the establishment of a Marina Resort Village with berthing for 420 yachts, access channel, turning basin and causeway associated residential and commercial buildings, fisherfolk facility, boardwalk, bunkering, desalination and wastewater treatment facilit |
Milford Bay, West Coast,
South West, Tobago |
Draft TOR
30-Dec-2020 |
|
|
6089/2020 |
2020-09-22 |
Tobago Regional
Health Authority |
37(a) |
The decommissioning, removal and re-installation of the existing CP30 incinerator for the disposal of medical waste |
from the New Scarborough General Hospital at Signal Hill to the Old Scarborough
General Hospital at Fort Street, Scarborough, Tobago |
CEC ISSUED
02-Feb-2021 |
|
|
6100/2020 |
2020-10-06 |
The National Gas Company of Trinidad and Tobago Limited (NGC) |
27 |
The installation of a 50.8 mm (2-inch) natural gas pipeline, 135 m in length |
from the tie-in point at the National Gas Company of Trinidad and Tobago Limited’s existing 102/76 mm (4/3-inch) pipeline along the Priority Bus Route to Caribbean Packaging Industries Located at Champ Fleurs |
CEC ISSUED
09-Apr-2021 |
|
|
6143/2020 |
2020-12-02 |
FCL Financial Limited |
8(a)(b)(c), 9, 11, 31(a), 39, 41(a)© |
the establishment of a 1000 room resort on 18.7258 hectares of land |
Tyson Hall between Kilgwyn Bay Road and Store Bay Local Road,
Tobago |
EIA Delay letter 7-August-2023 |
|
|
6158/2020 |
2020-12-22 |
BHP Petroleum (Trinidad Block 14) Limited and BHP Petroleum (Trinidad Block 23a) Limited |
24 |
the conduct a multi-year geophysical (non-seismic) and geotechnical survey of an area of 800km2 |
within the offshore Block TTDAA 14 and Block 23(A) and an area of 1600km2 within Block TTDAA 23(B), Block 24, NCMA 5 and adjoining open acreage, off the North East Coast of Tobago |
CEC ISSUED
24-Mar-2021 |
|
|