Tobago CEC

3456/2012
2012-04-16
Water and Sewerage Authority (WASA)
40(a) 40(b) 42
The installation of 1670m of 200 mm gravity mains and 4470m of force mains, construction of 8 lift stations, upgrade of 4 lift stations and upgrade of the Golden Grove Waste Stabilization Ponds
villages of Buccoo and Canaan, Tobago
CEC ISSUED 10-Jul-2012