No records
|
6370/2022 |
2022-02-16 |
Prakash Doodnath Bisram |
TBD |
Establishment of Home |
Congo Hill St. Patrick |
Status Update Letter 24-June-2022 |
|
|
6371/2022 |
2022-02-16 |
Nenaesh Ariyanayagam |
6240 |
The establishment of a 10-metre long rock revetment. |
Villa #60, Tobago Plantations, Lowlands, Tobago |
Withdrawal Letter 05-July-2024 |
|
|
6372/2022 |
2022-02-17 |
NewGen Energy Limited |
8(a), 20(b), 9 |
supply 3.4 tonnes/hour of Carbon Neutral/Green Hydrogen produced through electrolysis of water, at an availability of 96% minimum, utilizing power from a solar power facility and combined cycle power plants |
Point Lisas Industrial Estate Savonetta, Couva |
Final TOR Letter 14-Nov-2022 |
|
|
6373/2022 |
2022-02-22 |
NewGen Energy Limited |
1(a) |
Establishment of a Poultry Farm |
LP# 4 Genda Road Fishing Pond Sangre Grande |
Status Update Letter 14-June-2022 |
|
|
6374/2022 |
2022-02-22 |
Division of Infrastructure, Quarries and the Environment, Tobago House of Assembly |
13(a) |
Establishment of Temporary Jetty |
Little Tobago |
CEC ISSUED 28-Apr-2022 |
|
|
6375/2022 |
2022-03-01 |
Amit Rambaran |
8,9,33,40 |
Establishment of a residential development |
St. Aines Trace Guaico Tamana Road
Sangre Grande |
CEC ISSUED 03-May-2023 |
|
|
6376/2022 |
2022-03-01 |
Amit Rambaran |
8,9,33,40 |
Establishment of a residential development |
MC Larence Trace off Guaico Tamana Road, Sangre Grande |
Withdrawal Letter 10-March-2022 |
|
|
6377/2022 |
2022-03-01 |
NiQuan Energy Trinidad Limited |
26(A) |
To install and operate a Naphtha Tank and Naphtha Loading Bay at a Gas -to- Liquids Plant at Pointe-a-Pierre |
GTL Drive, Petrotrin Compound Pointe-a-Pierre |
Ack/FI
15 -March-2022 |
|
|
6378/2022 |
2022-03-01 |
BHP Petroleum Limited |
24 |
to conduct a multiyear geophysical (non-seismic) and geotechnical survey campaign for a potential export pipeline consisting of the following activities: 1) a seabed geophysical survey of up to 4,000 line-km per year comprising, as a minimum, of multibeam |
Offshore activity in Blocks 23(b), 24, NCMA 5, 25(a), 25(b), 2(d), 3(b), 3(c), 4(a), 4(b), 4(c), |
CEC ISSUED
9-June-2019
|
|
|
6379/2022 |
2022-03-01 |
Krystopher Seukumar |
1(A) |
Construction of a poultry Farm |
223B Cumuto Road Barrackpore |
CEC ISSUED 5-Apr-2022 |
|
|