No records
|
6151/2020 |
2020-12-08 |
Jason Julien & Camille Julien c/o
Laura Narayansingh |
8© |
the clearing, excavation, grading and filling of land with a gradient of 1:4 or more to facilitate the establishment of a single
family residence |
residence at Lot# 33 Wellsprings,
Cascade Main Road, Wellsprings
Development, Cascade |
CEC ISSUED
09-Mar-2021 |
|
|
6152/2020 |
2020-12-10 |
D Campo Sand & Gravel Ltd |
23 |
the establishment of a facility for the processing of sand and gravel |
Tapana Road, Valencia |
Status Update Letter 30-Sep-2022 |
|
|
6153/2020 |
2020-12-15 |
Roger Ali c/o Joel Francois |
5© |
the establishment of a sawmill |
Dickie Trace, Beach Road, Palo Seco |
CEC ISSUED
17-Aug-2021 |
|
|
6154/2020 |
2020-12-15 |
Ragoonanan's Woodwork Furniture Shop Ltd. |
5©, 20(a) |
the modification of an existing sawmill and woodworking shop to include a spray painting booth |
LP No. 126 # 542 5th Company Village Moruga Road |
Status Update Letter 04-May-2023 |
|
|
6155/2020 |
2020-12-15 |
Philip Alexander |
1(a) |
the establishment of a poultry farm for the rearing of a maximum of 24,000 broilers per cycle |
White Trace, St. Mary's Village Moruga Road, Moruga |
CEC ISSUED
19-Mar-2021 |
|
|
6156/2020 |
2020-12-15 |
Trinidad and Tobago National Petroleum Marketing Company Limited (NPMC) |
29(a) |
the installation of four (4)x 500- barrel operating capacity fuel storage tanks and associated works inclusive of two (2)x 300 gallon per minute pumping systems, pumps and foam and fire-water system |
|
CEC ISSUED
12-Apr-2022 |
|
|
6157/2020 |
2020-12-17 |
Shayphoe Sawmill & Woodwork Company Ltd |
5©, 20(a) |
the modification of an existing sawmill and woodworking shop to include a spray painting booth |
Bhagarratie Trace West, No. 296 Lachoo Road, Penal, |
Partial Response Letter
11-Feb-2021 |
|
|
6158/2020 |
2020-12-22 |
BHP Petroleum (Trinidad Block 14) Limited and BHP Petroleum (Trinidad Block 23a) Limited |
24 |
the conduct a multi-year geophysical (non-seismic) and geotechnical survey of an area of 800km2 |
within the offshore Block TTDAA 14 and Block 23(A) and an area of 1600km2 within Block TTDAA 23(B), Block 24, NCMA 5 and adjoining open acreage, off the North East Coast of Tobago |
CEC ISSUED
24-Mar-2021 |
|
|
6159/2020 |
2020-12-23 |
Parashram Maharaj c/o Ivan Laughlin, Ilesi Limited |
14( c) |
the establishment of infrastructure to facilitate residential development on 4.5 hectares of land |
Lots P1 & P2,
Eastern Main Road, Sangre Grande |
Ack./F.I.
08-Jan-2021 |
|
|
6160/2020 |
2020-12-29 |
The National Gas Company of Trinidad and Tobago Limited (NGC)
|
27 |
the establishment of 2.3km of natural gas pipeline and associated natural gas metering station and regulator station from an existing 16 inch natural gas pipeline |
to A.S. Bryden, ETECK Factory Road Industrial Estate along Factory Road, Chaguanas |
CEC ISSUED
18-Aug-2021 |
|
|