6100/2020 |
2020-10-06 |
The National Gas Company of Trinidad and Tobago Limited (NGC)
|
27 |
The installation of a 50.8 mm (2-inch) natural gas pipeline, 135 m in length |
from the tie-in point at the National Gas Company of Trinidad and Tobago Limited’s existing 102/76 mm (4/3-inch) pipeline along the Priority Bus Route to Caribbean Packaging Industries Located at Champ Fleurs |
CEC ISSUED
09-Apr-2021 |
|
|
6101/2020 |
2020-10-06 |
Brian Hackett c/o NLBA Architects |
8© |
the clearing, excavation, grading and excavation of land with a gradient of 1:4 or more to facilitate the establishment of a single family residence |
Lot #34 Wellsprings, Cascade Main Road, Wellsprings Development, Cascade |
Clarification Letter 23-May-2022 |
|
|
6102/2020 |
2020-10-08 |
The University of the West Indies (UWI) |
6 |
the expansion of a vegetable farm on 20.23 hectares of land |
Orange Grove Estate, off Churchill Roosevelt Highway |
CEC ISSUED
02-Mar-2021 |
|
|
6103/2020 |
2020-10-09 |
Sean O'Connor c/o Jesse Gyan |
13(a) ©, 41© |
the dredging of a coastal area of approximately 676 square meters and the establishment of associated coastal structures in the vicinity of the Trinidad and Tobago Yacht Club |
Paria Avenue off Western Main Road, Chaguaramas |
2nd Clarification Letter
4-Oct -2022 |
|
|
6104/2020 |
2020-10-12 |
Airport Authority of Trinidad and Tobago |
41 (a) |
the establishment of infrastructure and the relocation of a sewage pipeline on 1.54ha of land to facliltate the establishment f a 1MWp photovoltiaic (PV)- -Solar Farm for the generation of electricity |
Piarco International Airport |
CEC ISSUED
07-May-2021 |
|
|
6105/2020 |
2020-10-13 |
Creamery Novelties Ltd c/o Shazaad Mohammed |
14 (b) |
the expansion of an existing ice cream manufacturing facilityfrom an operating capacity of 2,500 metric tons per annum (MT/A) to a maximum operating capacity of 20,000 MT/A and the establishment of a facility for the storage of raw materials and finished |
Lots 6 and 6A Diamond Vale Industrial Estate, Diego Martin |
CEC ISSUED
17-Feb-2021 |
|
|
6106/2020 |
2020-10-13 |
Plantona Properties Ltd c/o Jesse Gyan |
13(a) |
the decommissioning of an abandoned jetty and the establishment of a new jetty |
Grand Fund Bay, Monos Island |
CEC ISSUED
6-Oct-2022 |
|
|
6107/2020 |
2020-10-15 |
Kori Baptiste c/o Akilah Bowen |
23 |
The establishment of a facility for the mining of sand and gravel on 40.47 ha of land |
9km Valencia Road, Matura Forest Reserve |
3rd Clarification Letter
17-July-2024 |
|
|
6108/2020 |
2020-10-15 |
Adrian Paul |
1(a) |
the expansion of a poultry farm and rabbit and rabbit unit |
#28 Warden Office Road South Oropouche |
CEC ISSUED
05-Aug-2021 |
|
|
6109/2020 |
2020-10-16 |
Dilsan Mining Contracting Company Limited |
23 |
the establishment of a facility for the mining of red sand on 6.475 hectares of land |
Cumuto Left Bank Road, Cumuto |
CEC ISSUED
14-Sep-2022 |
|
|