6079/2020 |
2020-09-10 |
Water and Sewerage Authority (WASA)
|
38(b) |
the drilling, developing and equipping of the Palo Seco #10 well for production status and the installation of a 500m of a 100mm Polyvinyl Chloride pipeline and its appurtenances |
|
CEC Gen Let.
05-May-2021
CEC ISSUED
30-Nov-2020 |
|
|