No records
|
6021/2020 |
2020-06-30 |
Trinidad and Tobago Electricity Commission (T&TEC) |
|
the establishment of a single storey structure to accommodate two Liquid Neutral Earth Resistors (LNERs) and the laying of electrical cables via the direct bury method to interconnect Gateway Substation to these LNERs |
Flament Street, Port of Spain |
NO CEC Required
08-Jul-2020 |
|
|
6022/2020 |
2020-06-30 |
OCCUMED Ltd |
43 |
the establishment of a medical diagnostic facility |
Lot Nos. 5&6 Road Reserve, Estate Trace off Dumfries Road, La Romain |
CEC ISSUED
01-Mar-2021 |
|
|
6023/2020 |
2020-07-02 |
Indra Ramcharan |
8(a), 40(a), 41(a) |
the establishment of infrastructure to facilitate a residential development on 12.946 hectares of land inclusive of drainage, roadways and water distribution systems |
LP 19, Orange Hill Road, Tobago |
CEC ISSUED
28-Dec-2020 |
|
|
6024/2020 |
2020-07-07 |
Emma Charles c/o Alvair Ltd |
8© |
the clearing, cutting and grading of land with a gradient of 1:4 or more to facilitate the construction of a single family residence |
Lot 12 Ronald Avenue, Cascade |
CEC ISSUED
28-Sep-2020 |
|
|
6025/2020 |
2020-07-07 |
Bino's Farm |
1(a) |
the expansion of a poultry farm for the rearing of a maximum of 4900 heads of layers through the addition of 4000 heads of layers for egg production |
No. 51 Reservoir Road, La Pastora, Santa Cruz |
CEC ISSUED
09-Sep-2020 |
|
|
6026/2020 |
2020-07-07 |
WASA c/o Roger Karim |
42 |
The modification of the existing Edinburg
500 wastewater treatment plant to include a new hypochlorite disinfection system |
5th Street, East Edinburgh 500, Chaguanas |
CEC ISSUED
30-Dec-2020 |
|
|
6027/2020 |
2020-07-09 |
Water and Sewerage Authority (WASA)
|
38(b) |
the drilling, development and equipping of a water well for the production status and its appurtenances |
Grande Riviere #2 off Toco Main Road |
CEC ISSUED
05-Aug-2020 |
|
|
6028/2020 |
2020-07-09 |
Inez Investments Ltd. c/o Allan Warner |
13(b) |
the establishment of a breakwater structure |
Granby Point, Fort Granby,
Tobago |
CEC ISSUED
11-Jun-2021 |
|
|
6029/2020 |
2020-07-09 |
Division of Infrastructure,
Quarries and the Environment |
8(c), 9, 33(b) |
the strategic widening of the existing roadway |
Turpin Bend, Windward Road, Charlotteville, Tobago |
CEC ISSUED
25-Sep-2020 |
|
|
6030/2020 |
2020-07-09 |
Ved Seereeram c/o CEMAS Ltd |
8©, 9, 33, 40(a),41(a)© |
the sub-division and establishment of infrastructure on 2.0194 hectares of land to facilitate a residential development on a gradient of 1:4 or more |
Corner of Fifth Company Branch Road & Moruga Road |
Clarification Letter
01-Mar-2021 |
|
|