No records
|
6000/2020 |
2020-03-25 |
Jhugh Hinds |
41(a)(b) |
the establishment of an irrigation system and pond to supply water for existing short term and long term crops farming on 3 hectares of a 8.28 hectare parcel of land |
21 Smithlands, Wallerfield, Arima |
CEC ISSUED
13-Nov-2020 |
|
|
6001/2020 |
2020-03-25 |
Bick Auto Wholesalers Limited c/o Chanan Motilal |
23 |
mining and processing of sand and gravel on 16.197 hectares land |
Block A, Pine Road, Melajo Forest Reserve, Sangre Grande |
CEC ISSUED
12-Jul-2021 |
|
|
6002/2020 |
2020-03-25 |
Global Dynamics Limited c/o Ecoengineering Consultant Ltd |
8(a)©, 9, 33, 40(a)©, 41(a), 42 |
the clearing, excavation, grading and land filling of 20.8ha of land and the installation of infrastructure to facilitate the establishment of a residential development |
off Talparo Road, Paradise Road, Brazil San Rafeal |
CEC ISSUED
1-Oct-2020 |
|
|
6003/2020 |
2020-03-25 |
Kall Co. Limited c/o Chanan Motilal |
23 |
the mining and processing of sand and gravel on 16.1878 hectares of land |
Block B, Tractor Road, Melajo Forest Reserve, Matura, Sangre Grande |
CEC ISSUED
29-Sep-2021 |
|
|