5986/2020 |
2020-03-10 |
Tobago Gas Trading & Logistics Limited c/o Curtis Alexander |
29 |
the establishment of a temporary and permanent liquified petroleum gas (LPG) storage facility at the Mittal/ISCOTT Port facility and Logidtics Limited's Site, respectively, inclusive of a 12 inch diameter pipeline between both sites |
Caribbean Drive, Point Lisas Industrial Estate, Point Lisas |
3rd Clar. Ltr.
7-Feb-2022 |
|
|