No records
|
5911/2019 |
2019-11-25 |
Water and Sewerage Authority (WASA)
|
40(b) |
the installation of 1.8km of a 200mm Polyvinyl Chloride pipeline and its appurtenances including bridge/culvert crossing and road reinstatement |
Endeavour Road to Soogrim Trace along Narsaloo Ramaya Road, Chaguanas |
CEC ISSUED
21-Apr-2020 |
|
|
5912/2019 |
2019-11-25 |
Nair Smart Solutions |
20(c) |
the modification of an existing metal fabrication workshop to include a paint room and storage area on 170 squared meters of land |
L.P. No. 42 Post Office Trace, New Grant, Princes Town |
CEC ISSUED
07-Oct-2020 |
|
|
5913/2019 |
2019-11-25 |
New Wave Management Limited |
20 © |
the operation of an existing extrusion machine, mixer and pulveriser at an existing polyvinyl chloride (PVC) manufacturing facility |
Lot #53 and #54 Calcutta Road #3, Calcutta Settlement Road #3 Mc Bean, Couva |
CEC ISSUED
27-Jan-2020 |
|
|
5914/2019 |
2019-11-25 |
Seeta Rajkumaire Drickpaul |
8(a), 40(a), 41(a) |
the establishment of infrastructure on 4.0468 hectares of land for a housing development |
Cedar Grove Road, LP No5, Sun Valley Drive, Block 5, Palmiste |
Status Update Letter 22-July-2022 |
|
|
5915/2019 |
2019-11-25 |
The National Gas Company of Trinidad and Tobago Limited (NGC)
|
27 |
the replacement and upgrade of an existing metering station |
National Petroleum Marketing Company's Service Station Rushworth Street, San Fernando |
CEC ISSUED
20-Mar-2020 |
|
|
5916/2019 |
2019-11-25 |
Patricia Mohammed c/o Brian Hamelet and Vernon Construction Limited |
40(a), 41(a) |
The establishment of infrastructure on 1.46 hectares of land for a housing development |
L.P. #1 Oropouche River Road, Barrackpore |
Clarification Letter 01-October-2024 |
|
|