Toggle Navigation
CEC Summary
EIA Summary
FOI Request
Information Centre Requests
General Request
National Register Request
Tobago - CEC Summary
CEC Summary
Toggle
CEC Summary
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Group by
None
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Clear filters
Advanced search
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
CEC ISSUED 17-Mar-2020
(1)
No records
5880/2019
2019-10-02
Ministry of Works and Transport (MOWT)
13(b)
the establishment of approximately 70 meters of gabion basket toe protection for an existing seawall
along the Paria Main Road, 51.99km Sangre Grande-Sans Souci
CEC ISSUED 17-Mar-2020
View
CEC ISSUED 01-May-2020
(1)
No records
5881/2019
2019-10-02
The University of the West Indies (UWI)
42
the establishment of a wastewater treatment plant
Sports and Physical Education Centre's Field, at the University of the West Indies Campus, St. Augustine
CEC ISSUED 01-May-2020
View
Status Letter 02-Aug-2024
(1)
No records
5882/2019
2019-10-07
PIA Quarry Limited
23
The establishment of a facility for the mining and processing of sand and gravel on 4.411 hectares of land.
7 1/4 MM Valencia Road, Valencia
Status Letter 02-Aug-2024
View
CEC ISSUED 03-Apr-2020
(1)
No records
5883/2019
2019-10-07
Mecklenburgh Square Limited
8©
the clearing and grading of land with a gradient of 1:4 or more to facilitate apartment buildings and associated infrastructure
CEC ISSUED 03-Apr-2020
View
Clarification Letter 28-Sep-2022
(1)
No records
5884/2019
2019-10-09
TN Ramnauth Company Limited
25
the modification of the WD-7m tank facility to install a new produced water treatment system
WD-7M Block, Forest Reserve, Fyzabad
Clarification Letter 28-Sep-2022
View
Status Update Letter 11-July-2022
(1)
No records
5885/2019
2019-10-09
Omar Ali
6, 8(a)(b)©
the establishment of a fruit and vegetable farm
109.5km Marker, Corner of Austin Road and Southern Main Road, Cedros
Status Update Letter 11-July-2022
View
CEC ISSUED 11-May-2020
(1)
No records
5886/2019
2019-10-09
Water and Sewerage Authority (WASA)
40(b)
installation of 9.85km of 500mm Ductile Iron (DI) transmission Main pipeline and its appurtenances including bridge/culvert crossing and road reinstatement
San Fernando WWTP to Pointe-a-Pierre Crude Oil Refinery, Pointe-a-Pierre
CEC ISSUED 11-May-2020
View
CEC ISSUED 21-Jan-2020
(1)
No records
5887/2019
2019-10-11
Environmental Science Ltd
37
the establishment of a thermal water treatment plant (liquid waste incinerator) at an existing waste treatment facility
7.5km Guayaguayare Road, Guayaguayare
CEC ISSUED 21-Jan-2020
View
Ack./F.I. Letter 25-Oct-2019
(1)
No records
5888/2019
2019-10-11
Rajkumar Ramraj
wood work
#2 Bellamy Trace Bunsee Trace Penal Rock Road
Ack./F.I. Letter 25-Oct-2019
View
Clarification Letter 29-July-2022
(1)
No records
5889/2019
2019-10-11
Harnarine Ramkhelawan
43(a)
the operation of an automotive machanical repair garage
#1A Goodman Branch Trace, Penal Rock Road, Penal
Clarification Letter 29-July-2022
View
You are here:
Home