EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 588 of 652 Total: 6514
  • Start
  • Prev
  • 583
  • 584
  • 585
  • 586
  • 587
  • 588
  • 589
  • 590
  • 591
  • 592
  • Next
  • End
42(1)
No records
5871/2019 2019-09-20 GAC Energy and Marine Services Ltd 42 the establishment of a wastewater treatment plant on board the Sevan Brazil Rig during the cold stacked Seven Brail Rig Area 3, Offshore, Point Lisas CEC ISSUED 05-Dec-2019
View
(1)
No records
5872/2019 2019-09-25 T&TEC the establishment of two(2) segments of the proposed Couva/ Longdenville 66kV circuits- section A&C Couva and Longdenville NO CEC Required 09-Oct-2019
View
43(a)(1)
No records
5873/2019 2019-09-25 Public Transport Service Corporation (PTSC) 43(a) decommissioning of the Public Transport Service Corporation existing vehicle maintenance and repair facility Lady Hailes Avenue, San Fernando Clarification Letter 14-Sep-2022
View
9, 43(a)(1)
No records
5874/2019 2019-09-25 Public Transport Service Corporation (PTSC) 9, 43(a) the establishment of an auto motive maintenance and repair facility for the Public Transport Service Corporation's Bus Fleet Golconda Link Road, San Fernando CEC ISSUED 16-Sep-2021
View
13(b)(2)
No records
5875/2019 2019-09-25 Tropikist Beach Hotel & Resort Limited 13(b) Tropikist Beach Hotel, Crown Point, Tobago Status Update Letter 9-Sep-2022
View
5880/2019 2019-10-02 Ministry of Works and Transport (MOWT) 13(b) the establishment of approximately 70 meters of gabion basket toe protection for an existing seawall along the Paria Main Road, 51.99km Sangre Grande-Sans Souci CEC ISSUED 17-Mar-2020
View
1(a)(1)
No records
5876/2019 2019-09-30 John Watts 1(a) the establishment of a poultry farm for the rearing of a maximum of 16000 broilers per cycle LP #T91 Brazil Arena Road, Brazil Village, Via San Raphael Ack./F.I. Letter 09-Oct-2019
View
8©(1)
No records
5877/2019 2019-09-30 Paul Hosein c/o Teem Engineering Systems Ltd 8© the establishment of a single family residence on 1120.9m2 of land Lot 36, Wellsprings, St. Anns CEC ISSUED 31-Mar-2020
View
8(c)(1)
No records
5878/2019 2019-10-02 Purple Pommerack Abode Limited 8(c) the clearing, cutting and grading of land with a gradient of 1:4 or more to facilitate a single family residential building Lot # 35 Wellsprings Development, Cascade CEC ISSUED 03-Apr-2020
View
14(a)(1)
No records
5879/2019 2019-10-02 MSK Seafood Limited 14(a) the operation of a fish processing and packaging facility Lot C, LP #62 Mohess Road, Debe CEC ISSUED 16-Oct-2020
View
  • You are here:  
  • Home

Back to Top

© 2023 EMA E-Summary