EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 584 of 652 Total: 6514
  • Start
  • Prev
  • 579
  • 580
  • 581
  • 582
  • 583
  • 584
  • 585
  • 586
  • 587
  • 588
  • Next
  • End
43(a)(3)
No records
5831/2019 2019-08-07 OMNITEK CNG Trinidad Limited 43(a) establishment of a Compressed Natural Gas (CNG) Conversion Centre 36-52 Chan Ramlal Street,
Chaguanas
Application Withdrawn 31-May-2022
View
5834/2019 2019-08-08 Dumore Enterprises Ltd 43(a) the expansion of an existing autobody repair garage within an existing facility to include an additional paint booth No. 13 Bellevue Industrial Estate, South Trunk Road, South Oropouche CEC ISSUED 09-Jan-2020
View
5836/2019 2019-08-09 D. Rampersad and Company Limited 43(a) the establishment of office space and machine shop facility for the service and repair of valves, rotating equipment, automotive engines, welding, fabricatinon and other services Lot 2, Brechin Castle, Couva Res. Ext. Req. 29-July-2022
View
(1)
No records
5832/2019 2019-08-08 Shane Aliasgar the installation of a seven kilowatt (7KW) wind turbine and photovoltaic array with associated cables to provide electricity mobile phone tower Manzanilla Mayaro Road Application Withdrawn 02-Apr-2020
View
42(1)
No records
5833/2019 2019-08-08 BHP Billiton Trinidad- 2( c) Limited 42 the decommissioning of an existing sewage treatment unit and installation of a new sewage treatment unit BHP Central Processing Platform Block 2©, North East Coast CEC ISSUED 15-Nov-2019
View
37(1)
No records
5835/2019 2019-08-09 Prakash Boodoo Enterprises Limited 37 the expansion of a scrap iron facility for the collection, processing and location of metals into shipping containers for recycling No. 180 San Fernando Siparia Erin Road, Debe Ack./F.I. Letter 23-Aug-2019
View
10(b)(ii), 32(1)
No records
5837/2019 2019-08-12 Steve Garibsingh c/o NIDCO  10(b)(ii), 32 upgrade to the existing terminal ANR Robinson International Airport,
Crown Point Tobago
CEC ISSUED 13-Sep-2019
View
44(b)(1)
No records
5838/2019 2019-08-12 Keith Belgrove c/o Belgrove Funeral Home 44(b) the establishment of a crematorium Lot #4, Auchenskeoch, Buccoo Bay Road, Tobago CEC ISSUED 09-Jan-2020
View
8(a), 9, 10(b)(ii), 40, 41, 42, 43(1)
No records
5839/2019 2019-08-13 Urban Development Corporation of Trinidad and Tobago (UDeCoTT) 8(a), 9, 10(b)(ii), 40, 41, 42, 43 the upgrade of the existing Mahaica Sports Complex George Street, St. Patrick, Point Fortin Notice of Refusal 5-Nov-2020
View
27(1)
No records
5840/2019 2019-08-16 The National Gas Company of Trinidad and Tobago (NGC) 27 the modification of NGC'S existing 16-inch (406mm) natural gas pipeline 4 different locations between Barataria Roundabout and Dock Road, Port of Spain CEC ISSUED 13-Mar-2020
View
  • You are here:  
  • Home

Back to Top

© 2023 EMA E-Summary