No records
|
5760/2019 |
2019-05-13 |
BPTT |
26, 27 |
the installation of a normally unmanned platform, drilling 6 development wells 1 contingency well, installation of a 17km 20inch export pipeline to Amherstia and 30km Umbilical to Cassia B, including platform modifications respectively |
East Mayaro Block, East Coast Trinidad |
Withdrawal Letter 9-Jan-2023 |
|
|
5761/2019 |
2019-05-14 |
EOG Resources Trinidad Limited |
26(a), 27 |
the installation of the Osprey East Platform, drilling and completion of nine (9) development wells and the installation of a new 5-KM 10INCH Subsea pipeline |
U(a) Block, Offshore, East Coast, Trinidad |
CEC ISSUED
21-Apr-2021
|
|
|
5762/2019 |
2019-05-15 |
Nabbie Mohammed |
1(a) |
the expansion of an existing poultryfarm for an additional 1000 heads of layers per cycle |
L.P. 19 Plot #10 Connector Road, Carlsen Field, Chaguanas |
Ack./F.I.
29-May-2019 |
|
|
5763/2019 |
2019-05-17 |
New Wave Marketing Ltd |
20©, 43(a) |
the modification/expansion of an existing Polyvinyl Chloride (pvc) manufacturing facility to include two (2) additional PVC extruder machines, mixer and an injection mould machine with an increased capacity of 600 ton per annum and the operation of an aut |
Lot # 53 &54 Calcutta Road #3, Mc Bean, Couva |
CEC ISSUED
11-Jul-2019 |
|
|
5764/2019 |
2019-05-20 |
Christine Abdul |
8(a), 9, 33(a), 40(a), 41(a)(b) |
the establishment of infrastructure for residential development of 3.64 hectares of land |
Road Reserve off Ramnarine Street, Fyzabad |
CEC ISSUED
02-Feb-2021 |
|
|
5765/2019 |
2019-05-20 |
St. Bernard's Funeral Home |
44(b) |
the establishment of a funeral home on 0.1868 Hectares of land |
# 4B Manuel Congo Road, Arima |
NO CEC Required
12-Jul-2019 |
|
|
5766/2019 |
2019-05-20 |
Water and Sewerage Authority (WASA)
|
40(b) |
installation of 1663m of 100mm PVC pipeline and its appurtenances including bridge/culvert crossings and road reinstatement |
Along Wharton Street, Unnamed Street #1 and Unnamed Street #2, to Pilgrim Street and along Leon Street, Point Fortin |
CEC ISSUED
16-Aug-2019 |
|
|
5767/2019 |
2019-05-21 |
The National Gas Company of Trinidad and Tobago (NGC) |
43(a) |
the establishment of a temporary fleet maintenance operations facility and wash bay area for the National Gas Company of Trinidad and Tobago fleet vehicles |
Bungalow 27, Rivulet Road, Point Lisas, Couva |
CEC ISSUED
20-Apr-2020 |
|
|
5768/2019 |
2019-05-21 |
UDECOTT |
8(a), 9, 10(b)(ii), 9 40(a), 41(a) |
the expansion and refurbishment of the Skinner Park Recreational Facility |
Corner of Rienzi Highway and Cipero Street, San Fernando |
CEC ISSUED
13-Jul-2020 |
|
|
5769/2019 |
2019-05-23 |
Keith Belgrove c/o Belgove Funeral Home |
44 |
To operate crematorium |
Fort and Cuyler Street, Tobago |
Application Withdrawn
Ack sent on 12-July-21 |
|
|