CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 679 of 704 Total: 7037
  • Start
  • Prev
  • 674
  • 675
  • 676
  • 677
  • 678
  • 679
  • 680
  • 681
  • 682
  • 683
  • Next
  • End
Ack/FI Letter 07-Dec-2023(1)
No records
6780/2023 2023-11-23 Sonriz Engineering Services Limited 38 The Establishment of a Facility for the Storage and Handling of Used Automotive Batteries for Packaging and Exporting at Lot #21 Labidco Industrial Estate, La Brea Lot #21 C Labidco Industrial Estate, la Brea Ack/FI Letter 07-Dec-2023
View
Ack/FI Letter 08-Dec-2023(1)
No records
6781/2023 2023-11-27 Gillian Adolphus 1 The establishment of a Poultry Farm at Hope Trace Extension, Hope Trace, Penal Rock Road, Penal Hope Trace Extension, Hope Trace, Penal Rock Road, Penal Ack/FI Letter 08-Dec-2023
View
NO CEC Required 11-December-2023(1)
No records
6782/2023 2023-11-27 Gillian Dennis 3 , 6 The Expansion of an Existing Micro-Aquaponics Farm by 0.4047 Hectares to Increase Production of Leafy Vegetables at ¼ MM La Pastora Road, Santa Cruz 1/4 mm La Pastora Road, Santa Cruz NO CEC Required 11-December-2023
View
CEC ISSUED 16-February-2024(1)
No records
6783/2023 2023-11-29 Shell Trinidad & Tobago Limited (STTL) 26 The upper hole re-completion of three Dolphin ‘A’ Platform wells; DAP-4, DAP-6 and DAP-7 along with associated pipe tie-ins and instrumentation upgrades for the increase in gas production Dolphin ‘A’ Platform (DAP) which is located within the Dolphin Field in Block 6(b) in the East Coast Marine Area (ECMA) CEC ISSUED 16-February-2024
View
Withdrawal Letter 29-January-2024(1)
No records
6784/2023 2023-11-30 The Clover Marketing Company Limited 8 , 23 The Establishment of a Facility for the Storage of Construction Material on 5000 m2 of Land at L.P. No. 5 NPC Farm Road, Basta Hall, Couva LP. No.5. NPC Farm road, Basta Hall, Couva Withdrawal Letter 29-January-2024
View
Withdrawal Letter 08-December-2023(1)
No records
6785/2023 2023-11-30 Palms of Santa Cruz Ltd. 8, 9, 33, 40 Establishment of a residential development LP#65 La Sagesse Road, Santa Cruz Withdrawal Letter 08-December-2023
View
Clarification Letter 23-April-2024(1)
No records
6786/2023 2023-12-01 Roland Boodoo's Funeral Home Limited 44 Establishment of a crematorium at an existing funeral home. #247 Southern Main Road, Cunupia Clarification Letter 23-April-2024
View
Ack/FI Letter 19-Dec-2023(1)
No records
6787/2023 2023-12-05 Jillian Mitchell-Sammy 8 (c) Establish a roadway lot #3, Kings Bay, Delaford, Tobago Ack/FI Letter 19-Dec-2023
View
Extension Letter 10-May-2024(1)
No records
6788/2023 2023-12-05 International Projects Initiative Ltd 9, 10, 33, 14, 42 The Establishment of commercial multi-story buildings for a strip mall and associated infrastructure for parking, water reticulation and electricity; and the commisioning of an existing wastewater treatment plant at parcels a (lots 120-122) and B (Lots 1 LOTS #120,121 & 122 Parcel A and Lots#115 – 118 Parcel B, Belmont Road, Hope Estate , Parish of St. George, Tobago Extension Letter 10-May-2024
View
CEC ISSUED 09-July-2024(1)
No records
6789/2023 2023-12-06 Woodside Energy (Trinidad Block 14) Limited, Woodside Energy (Trinidad Block 23a) Limited 24 The conduct of a Multi-Year geophysical (Non-seismic) and Geotechnical survey for a potential export pipeline within a shallow water area of 5553 square kilometre including various offshore blocks off the East Coast of Trinidad. Offshore Trinidad and Tobago CEC ISSUED 09-July-2024
View