No records
|
6881/2024 |
2024-05-21 |
Corey's Welding and Fabrication |
20 (c) |
The expansion of a workspace for an existing welding and fabrication workshop at #92 Emerald Circular, Con Air Gardens, Arouca |
Bon Air Gardens, Arouca |
Ack/FI Letter 06-June-2024 |
|
|
6882/2024 |
2024-05-21 |
Saran Kissoondan |
8 (c) |
The establishment of infrastructure on 2.6125 hectares of land with a gradient of 1:4 or more to facilitate a multi family residential development |
3rd Street, Maraval |
Determination Letter 08-August-2024 |
|
|
6883/2024 |
2024-05-21 |
Jagdeo Goberdhan |
8 (a) (b) (c) |
The clearing, cutting, excavating, grading and filling of 0.8094 hectares of 2.45 hectaresland, land, off Chin Chin Road, Cunupia. |
Chin Chin Road, Cunupia |
Ack/FI Letter 06-June-2024 |
|
|
No records
|
6885/2024 |
2024-05-27 |
Aleskie Lamorell |
1 (a) (b) |
The expansion of an existing poultry farm to attain a maximum of 2400 heads of broilers per cycle inclusive of slaughtering at lot #10 Johnson Trace, Rancho Quemado. |
Rancho Quemado |
Ack/FI Letter 12-June-2024 |
|
|
6886/2024 |
2024-05-27 |
JNCO Enterprise |
10 |
The expansion of the Maracas/St Joseph Health Centre, Santa Barabara Road, Maracas St. Joseph |
Maracas Royal Road, Maracas St Joseph |
NO CEC Required 18-July-2024 |
|
|
6887/2024 |
2024-05-27 |
Eco Scrap Solutions |
36, 37, 43 (a) |
The modification of a facility for the segregation, recovery and recycling of waste oil, ferrous and non-ferrous metals and used lead acid batteries for the shipping and the operation of an automotive repair garage at Eagles Drive, Carlsen Field. |
Carlsen Field |
Ack/FI Letter 14-June-2024 |
|
|
6888/2024 |
2024-05-27 |
Water and Sewerage Authority (WASA) |
38 (c) |
The establishment of a new 1 million gallons per day (1MGPD) modular desalination water treatment plant and associated infrastructure at L.P. No. 150 La Lune Road, Moruga. |
Moruga/ La Lune |
Ack/FI Letter 12-June-2024 |
|
|
6889/2024 |
2024-05-27 |
Water and Sewerage Authority (WASA) |
38 (a), 40 (b), 41 (c) |
Upgrade of the Carlsen Field Water Treatment Plant and the establishment of a Floating Barge Intake, Recharge Transfer System and an associated pipeline at the Ravine Sable Sand Pits (RSSP) |
Caparo/ Carlsen Field & Ravine Sable |
Ack/FI Letter 12-June-2024 |
|
|