EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 636 of 652 Total: 6514
  • Start
  • Prev
  • 631
  • 632
  • 633
  • 634
  • 635
  • 636
  • 637
  • 638
  • 639
  • 640
  • Next
  • End
Mrs. Sonia Fracis- Yearwood, Ministry of Works and Transport(1)
No records
6351/2022 2022-01-18 Mrs. Sonia Fracis- Yearwood, Ministry of Works and Transport 8, 9 (a) 2.3km along CRH, from UWI traffic lights to Tacarigua River (0.65km East of Macoya Traffic Lights) Macoya Response to Extension Request 2-Sep-2022
View
Ardennes Home Ltd (1)
No records
6352/2022 2022-01-18 Ardennes Home Ltd 8(a), 9, 33(a), 38(b), 40(a), 41(a)(b) and 42 Residential Development
Carapo, Arima  CEC ISSUED 13-May-2022
View
WASA(1)
No records
6353/2022 2022-01-18 WASA 38 (b) Drilling, developing and equipping of the Balmain Well #2 for production status. Rivulet Road, Balmain, Couva CEC ISSUED 4-Mar-2022
View
Massy Distribution (1)
No records
6354/2022 2022-01-21 Massy Distribution TBD To destroy expired bonded liquor Corner Macoya Rd and Churchill Roosevelt Highway Clarification Letter 16-May-2022
View
BPTT(1)
No records
6355/2022 2022-01-27 BPTT 27, 29
Construction of a new 500,000 bbls capacity storage tank and Replacement of the 42-inch piping that is utilized to transfer product from the storage tanks to the loading pumps at bp Trinidad and Tobago (bpTT) Galeota Point Terminal facility.

Mayaro
Clarification Letter 12-Sep-2022
View
Naresh Samlal(1)
No records
6356/2022 2022-01-28 Naresh Samlal 3 Establishment of a 0.42 hectare pond for fish propagation.
Wallerfield, Arima

CEC ISSUED 20-May-2022
View
TTEC c/o WSP Caribbean Ltd. (1)
No records
6357/2022 2022-02-01 TTEC c/o WSP Caribbean Ltd. 40 (A) 41(A) 42

construction of a new facility that will provide an improved functional layout for the Distribution East Department. The facility is to be developed as two (2) building

Corner of Richard's Trace & Tumpuna Road Arima
CEC ISSUED 13-May-2022
View
Gowrie Parsadsingh Contracting Company Ltd (1)
No records
6358/2022 2022-02-02 Gowrie Parsadsingh Contracting Company Ltd  18
Facility for Construction
280 Jeffers Crossing Tabaquite Road Rio Claro  Ack/Determination Ltr 17 -Feb-2022
View
APR Associates Limited(1)
No records
6359/2022 2022-02-03 APR Associates Limited TBD Construction and operation of 2 story commercial building for the primary purpose of rental space for retail sales Lot B 237 Western Main Road
Cocorite
No CEC Required 15-Feb-22
View
Lease Operators Ltd (1)
No records
6360/2022 2022-02-03 Lease Operators Ltd 24 The replacement and development drilling of 20 wells for the purpose of extraction of crude oil or production of associated gas within the PS 1 and WD 1 Block- Palo Seco
St. Patrick
Palo Seco

Ack/FI 17 -Feb-2022
View
  • You are here:  
  • Home

Back to Top

© 2023 EMA E-Summary