6095/2020 |
2020-09-30 |
The National Gas Company of Trinidad and Tobago Limited (NGC)
|
8(a)(b), 27 |
the establishment of an 8-inch Natural Gas pipeline, 2km in length, to connect to the Natioanl Gas Company of Trinidad and Tobago Limmited's (NGC's) existing 30inch pipeline and the upgrade of the NGC's Poole Valley Valve Station to include a metering station |
Poole Valley Road, Rio Claro |
Determination Letter 16-March-2022 |
|
|
6100/2020 |
2020-10-06 |
The National Gas Company of Trinidad and Tobago Limited (NGC)
|
27 |
The installation of a 50.8 mm (2-inch) natural gas pipeline, 135 m in length |
from the tie-in point at the National Gas Company of Trinidad and Tobago Limited’s existing 102/76 mm (4/3-inch) pipeline along the Priority Bus Route to Caribbean Packaging Industries Located at Champ Fleurs |
CEC ISSUED
09-Apr-2021 |
|
|