EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request
  • Tobago - CEC Summary

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 678 of 710 Total: 7092
  • Start
  • Prev
  • 673
  • 674
  • 675
  • 676
  • 677
  • 678
  • 679
  • 680
  • 681
  • 682
  • Next
  • End
Tattoo Trace, Block 2, Valencia(1)
No records
6771/2023 2023-11-08 Reynold Patrong 23 The etablishment of a facility of a factory for mining and processing of sand and gravel on 8.098 ha (20 acres) parcel land tatto Trace , Valencia. Tattoo Trace, Block 2, Valencia Status Update Letter 12-Sept-2024
View
Southern Main Road, School Street, Fullerton Junction, Icacos/Fullerton(1)
No records
6772/2023 2023-11-08 Water and Sewerage Authority (WASA) 40 (b) The Installation of 3.1 Km of 200-mm Polyvinyl Chloride Pipeline Inclusive of all Crossings and Appurtenances Southern Main Road, School Street, Fullerton Junction, Icacos/Fullerton CEC ISSUED 01-December-2023
View
Off Shore(1)
No records
6773/2023 2023-11-14 BG International / BP Exploration Operating Company Ltd.(BGI/BPOEC) 24 The Conduct of a 3-Dimensional Seismic Survey with a total area of 4,000 km2 within Blocks 25A, 25B and 27, East Coast Marine Area, Offshore, Trinidad Off Shore CEC ISSUED 09-May-2024
View
Bushy Park, Glamorgan, Tobago(1)
No records
6774/2023 2023-11-15 Joel Butcher 38 (a) , 40(c) The Excavation, Modification and Abstraction from a River to Facilitate Crop Irrigation and Animal Watering on a Farm on 1.6 hectares of land at Bushy Park Branch Road, Glamorgan, Tobago Bushy Park, Glamorgan, Tobago Ack/FI Letter 11-Jan-24
View
LP No. 14, Sand Hill Trace, Tabaquite(1)
No records
6775/2023 2023-11-16 Judy Ramlal-Holder 41 (a) (b) The establishment of infrastructure for residential homestead plots on 1.1716 hectares of land for the future development. LP No. 14, Sand Hill Trace, Tabaquite CEC ISSUED 05-September-2024
View
Point Fortin (1)
No records
6776/2023 2023-11-16 Land Settlement Agency 8 (a), 9, 33(a)(c), 40 (a), 41 (a) The installation of infrastructure and subdivision at an existing 40.43- Hectare Unplanned Residential Development Point Fortin CEC ISSUED 10-July-2024
View
Rampersad Trace, Syfoo Trace, Granville (old) Road(1)
No records
6777/2023 2023-11-17 Water and Sewerage Authority (WASA) 40 (b) The installation of two (2) kilometres of 100-mm and 150-mm polyvinyl chloride pipelines inclusive of all crossings and associated appurtenances Rampersad Trace, Syfoo Trace, Granville (old) Road CEC ISSUED 20-December-2023
View
#42 Diaz Road Tabaquite(1)
No records
6778/2023 2023-11-17 Lincoln Ramlal 1 (a) The Expansion of an Existing Poultry Farm to include an additional 500 heads of Broilers to attain a Maximum of 7,500 heads per cycle and Associated Infrastructure at No. 42 Diaz Road, Tabaquite. #42 Diaz Road Tabaquite Ack/FI Letter 29-Nov-2023
View
Lot #9 Cromwell Road, Cascade (1)
No records
6779/2023 2023-11-21 Chantal Perryman 8 (c) The Clearing, Cutting and Grading of Land with a Gradient of 1:4 or more to Facilitate the Establishment of a Single-Family Residence at Lot # 9, Cromwell Road, Cascade Lot #9 Cromwell Road, Cascade CEC ISSUED 15-October-2024
View
Lot #21 C Labidco Industrial Estate, la Brea(1)
No records
6780/2023 2023-11-23 Sonriz Engineering Services Limited 38 The Establishment of a Facility for the Storage and Handling of Used Automotive Batteries for Packaging and Exporting at Lot #21 Labidco Industrial Estate, La Brea Lot #21 C Labidco Industrial Estate, la Brea Ack/FI Letter 07-Dec-2023
View
  • You are here:  
  • Home

Back to Top

© 2025 EMA E-Summary