EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 616 of 646 Total: 6451
  • Start
  • Prev
  • 611
  • 612
  • 613
  • 614
  • 615
  • 616
  • 617
  • 618
  • 619
  • 620
  • Next
  • End
the clearing, excavation, grading and filling of land with a gradient of 1:4 or more to facilitate the establishment of a single family residence (1)
No records
6151/2020 2020-12-08 Jason Julien & Camille Julien c/o Laura Narayansingh 8© the clearing, excavation, grading and filling of land with a gradient of 1:4 or more to facilitate the establishment of a single
family residence
CEC ISSUED 09-Mar-2021
View
the establishment of a facility for the processing of sand and gravel(1)
No records
6152/2020 2020-12-10 D Campo Sand & Gravel Ltd 23 the establishment of a facility for the processing of sand and gravel Ack./F.I. 24-Dec-2020
View
the establishment of a sawmill(1)
No records
6153/2020 2020-12-15 Roger Ali c/o Joel Francois 5© the establishment of a sawmill CEC ISSUED 17-Aug-2021
View
the modification of an existing sawmill and woodworking shop to include a spray painting booth(2)
No records
6154/2020 2020-12-15 Ragoonanan's Woodwork Furniture Shop Ltd. 5©, 20(a) the modification of an existing sawmill and woodworking shop to include a spray painting booth Resp. Ext. Request 02-Feb-2021
View
6157/2020 2020-12-17 Shayphoe Sawmill & Woodwork Company Ltd 5©, 20(a) the modification of an existing sawmill and woodworking shop to include a spray painting booth Partial Response Letter 11-Feb-2021
View
the establishment of a poultry farm for the rearing of a maximum of 24,000 broilers per cycle(1)
No records
6155/2020 2020-12-15 Philip Alexander 1(a) the establishment of a poultry farm for the rearing of a maximum of 24,000 broilers per cycle CEC ISSUED 19-Mar-2021
View
the installation of four (4)x 500- barrel operating capacity fuel storage tanks and associated works inclusive of two (2)x 300 gallon per minute pumping systems, pumps and foam and fire-water system(1)
No records
6156/2020 2020-12-15 Trinidad and Tobago National Petroleum Marketing Company Limited (NPMC) 29(a) the installation of four (4)x 500- barrel operating capacity fuel storage tanks and associated works inclusive of two (2)x 300 gallon per minute pumping systems, pumps and foam and fire-water system CEC ISSUED 12-Apr-2022
View
the conduct a multi-year geophysical (non-seismic) and geotechnical survey of an area of 800km2(1)
No records
6158/2020 2020-12-22 BHP Petroleum (Trinidad Block 14) Limited and BHP Petroleum (Trinidad Block 23a) Limited 24 the conduct a multi-year geophysical (non-seismic) and geotechnical survey of an area of 800km2 CEC ISSUED 24-Mar-2021
View
the establishment of infrastructure to facilitate residential development on 4.5 hectares of land (1)
No records
6159/2020 2020-12-23 Parashram Maharaj c/o Ivan Laughlin, Ilesi Limited 14( c) the establishment of infrastructure to facilitate residential development on 4.5 hectares of land Ack./F.I. 08-Jan-2021
View
the establishment of 2.3km of natural gas pipeline and associated natural gas metering station and regulator station from an existing 16 inch natural gas pipeline (1)
No records
6160/2020 2020-12-29 The National Gas Company of Trinidad and Tobago Limited (NGC) 27 the establishment of 2.3km of natural gas pipeline and associated natural gas metering station and regulator station from an existing 16 inch natural gas pipeline CEC ISSUED 18-Aug-2021
View
  • You are here:  
  • Home

Back to Top

© 2022 EMA E-Summary