Toggle Navigation
CEC Summary
EIA Summary
FOI Request
Information Centre Requests
General Request
National Register Request
CEC Summary
Toggle
CEC Summary
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Group by
None
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
Clear filters
Advanced search
CEC Ref #
Date Received
Applicant
Activity
Description
Location
Status
1(a), 41(a)
(1)
No records
6111/2020
2020-10-20
Danakah Jimdar
1(a), 41(a)
the establishment of a poultry farm with a maximum capacity of 40,000 heads of broilers per cycle on 1.2 ha of a 5.261 ha parcel of land
CEC ISSUED 19-Jan-2021
View
1(a)
(2)
No records
6112/2020
2020-10-20
Andy William/ Kayann Marshall
1(a)
the establishment of a poultry farm on 1.9758hectares of land
CEC ISSUED 22-Jul-2021
View
6113/2020
2020-10-22
Vaughrick Bernard
1(a)
the expansion of an existing poultry farm for the rearing of a maximum of 50,000 broilers
Ack./F.I. 05-Nov-2020
View
1(a), 39, 41(a)
(1)
No records
6114/2020
2020-10-22
Michael Ramdath
1(a), 39, 41(a)
the establishment of a poultry farm for the rearing of a maximum of 30,000 heads of broilers per cycle on 1.3697 hectares of land
CEC ISSUED 14-Dec-2020
View
3, 23
(1)
No records
6115/2020
2020-10-22
Richard Smith
3, 23
the mining of sand and gravel and the establishment of an aquaculture facility on 20 acres (8.09ha) of land
Ack./F.I. 05-Nov-2020
View
14(b), 43(d)
(1)
No records
6116/2020
2020-10-26
Associated Brands Industries Limited c/o Ecoengineering Consultants Limited
14(b), 43(d)
the decommissioning and establishment of a production of multiple snack lines and packaging
CEC ISSUED 11-Feb-2021
View
8 (a),9, 12, 41
(1)
No records
6117/2020
2020-10-27
Southern Supplies (Millennium) Limited
8 (a),9, 12, 41
the filling of a coastal area
Resp. to NOR Appeal 08-Apr-2021 Notice of Refusal 05-Mar-2021
View
1(b)
(1)
No records
6118/2020
2020-10-27
Randell Patterson
1(b)
the expansion of a duck farm to accommodate the rearing, breeding and hatching of a maximum of 700 heads of ducks per cycle
CEC ISSUED 31-Dec-2020
View
36
(1)
No records
6119/2020
2020-10-27
Petroleum Contracting Services Limited
36
the disposal of produced water from the WD-16 gathering station via reinjection into the well QU-252
Clar. L. 25-Aug-2021 Clarification L. 22-Apr-2021 Ack./F.I. 10-Nov-2020
View
25(a)
(1)
No records
6120/2020
2020-10-27
Petroleum Contracting Services Limited
25(a)
the secondary recovery of crude oil via the re-injection of produced water into exisitng wells
Clar. L. 25-Aug-2021 Clarification Letter 06-Apr-2021
View
You are here:
Home