No records
|
6691/2023 |
2023-07-10 |
Meena Mohammed |
1 |
Establishment of two (2) 50 x 100 poultry pen for rearing of 10,000 layers on 1 acre of land for the production of 9000 eggs daily |
54A Nanan South Trace, Barackpore |
CEC ISSUED 29-August-2023 |
|
|
6692/2023 |
2023-07-11 |
Southern Caribbean Fiber Ltd. |
13 (c) |
The landing of a submarine cable system inclusive of concrete headwalls and beach manholes |
Trinidad - Staubles Bay to CDA head office via Western Main Rd, Tobago - Rockly Bay to SCF Cable Landing Station via Milford Rd |
CEC ISSUED 17-October-2023 |
|
|
6693/2023 |
2023-07-17 |
Woodland Limited |
18 (a), 21 |
For the establishment a concrete batching plant and metal fabrication facility at lots A and B, South Trunk Road, La Romaine |
Lot A & B South Trunk Road, La Romaine, San Fernando |
Clarification Letter 16-October-2024 |
|
|
6694/2023 |
2023-07-17 |
Oilbelt Services Limited |
8, 24, 33 |
To conduct exploratory drilling at ten (10) surface well locations to evaluate the hydrocarbon potential of Buenos Ayres Block, Buenos Ayres, Southwest Trinidad. |
Buenos Ayres |
Reaponse Letter 11-November-2024 |
|
|
6695/2023 |
2023-07-18 |
A.S. Bryden and Sons Holdings Ltd |
8(a), 9, 41, 42 |
The establishment of infrastructure to facilitate construction of a dry goods warehouse on 9.8354 hectares of land |
T2 Factory Road, Chaguanas |
CEC ISSUED 22-December-2023 |
|
|
6696/2023 |
2023-07-18 |
National Insurance Property Development Company Limited (NIPDEC) |
10 (a) |
To construct a Shopping Centre to be used as an incubator facility for micro-entrepreneurs. This is to replace the Drag Brothers Mall that was destroyed by fire in 2018 |
43 Independence Square South, Port-of -Spain |
NO CEC Determination 18-August-2023 |
|
|
6697/2023 |
2023-07-19 |
Michael Parris |
8 (b) (c) |
Establishment of a 3acre Chadon Beni farm |
El Recreo Estate, Hobal Trace, Maracas Valley |
No CEC Determination 02-August-2023 |
|
|
6698/2023 |
2023-07-19 |
WASA |
40 (b) |
The installation of 1.50km of 200mm Polyvinyl Chloride (PVC) pipeline along Southern Main Road from LABIDCO Roundabout to Vessigny Secondary School, inclusive of all crossings and associated appurtenances. |
Along Southern Main Road, Vessigny |
CEC ISSUED 7-September-2023 |
|
|
6699/2023 |
2023-07-21 |
CL Marine Limited |
13 |
Dredging (Pier 4, East) To support installation of proposed new floating drydock |
Western Main Road , Port Chaguaramas |
Ack/FI Letter 04-August-2023 |
|
|
6700/2023 |
2023-07-21 |
CL Marine Limited |
34 |
Decommissioning/Removal of sunken floating drydock and subsequent installation of new floating drydock |
Western Main Road , Port Chaguaramas |
Withdrawal Letter 07-September-2023 |
|
|