No records
|
6080/2020 |
2020-09-16 |
Surendra Harricharan |
1(a), 41 |
the establishment of a poultry farm for the rearing of a maximum of 19,500 heads of broilers pre cycle |
Railway Street, San Pedro |
CEC ISSUED
12-Jan-2021 |
|
|
6081/2020 |
2020-09-16 |
Natasha Valdez |
1(a), 39 |
the establishment of a poultry farm for the rearing of 20,000 heads of broilers per cycle on 0.6504 hectares of land |
LP#8 Arjoonsingh Trace, off Seemungal Trace, Penal Rock Road, Penal |
CEC ISSUED
18-Dec-2020 |
|
|
6082/2020 |
2020-09-16 |
National Energy Corporation of TT Ltd (NEC) |
|
establishment of two internal access roads and associated drainage on 0.32 hectares of land |
Point Lisas North Industrial Estate, Couva |
No CEC Required
01-Oct-2020 |
|
|
6083/2020 |
2020-09-16 |
South Winds Famalia Ltd |
1(a) 8(a), 39 |
the expansion of an existing poultry and ivestock farm for the rearing of a maximum of 5,000 broilers, 5,000 ducks, 200 pigs and 100 goats for meat and the rearing of a maximum of 10,000 layers and 10,000 quails for egg s as wells as associated infrastruc |
144 Pascal Trace, Rio Claro |
CEC ISSUED
26-Jan-2021 |
|
|
6084/2020 |
2020-09-17 |
Vistas of Paxvale Ltd. |
8(a, b & c) , 40(a & b),
41(a & b) |
the establishment of infrastructure to facilitate a residential development on 4.4293 hectares of land |
Saddle Road, Santa Cruz |
CEC ISSUED
14-Jun-2021 |
|
|
6085/2020 |
2020-09-18 |
Coastal Technologies
Limited |
8,9,12, 13, 14(a), 18(b), 29, 31(a), 33(a)(b), 34, 35, 38 ©, 40(a), 41(a), 42, 43(a)(b)© |
the establishment of a Marina Resort Village with berthing for 420 yachts, access channel, turning basin and causeway associated residential and commercial buildings, fisherfolk facility, boardwalk, bunkering, desalination and wastewater treatment facilit |
Milford Bay, West Coast,
South West, Tobago |
Status Update Letter
09-Nov-2023 |
|
|
6086/2020 |
2020-09-18 |
Bestcrete Aggregate Limited |
23 |
The mining of sand and gravel on 84.6 ha (209 acres) of land at an increased depth from 10m to 30m |
Pine Road, within the Melajo Forest Reserve, Matura, Trinidad |
Withdrawal Letter 06-December-2023 |
|
|
6087/2020 |
2020-09-21 |
Trinity Exploration and
Production (Galeota) Limited |
27 |
the establishment of a new eight (8) inch produced water discharge pipeline system and the in-place abandonment of the existing pipeline |
offshore Mayaro Bay |
CEC ISSUED 07-Dec-2021 |
|
|
6088/2020 |
2020-09-21 |
National Energy Corporation of TT Ltd (NEC) |
8(a) |
establishment of an internal access road |
Point Lisas South and East |
No CEC Required
05-Oct-2020 |
|
|
6089/2020 |
2020-09-22 |
Tobago Regional
Health Authority |
37(a) |
The decommissioning, removal and re-installation of the existing CP30 incinerator for the disposal of medical waste |
from the New Scarborough General Hospital at Signal Hill to the Old Scarborough
General Hospital at Fort Street, Scarborough, Tobago |
CEC ISSUED
02-Feb-2021 |
|
|