5721/2019 |
2019-03-27 |
Allistar John Hosainie |
1(a) |
the establishment of a poultry farm for the rearing of a maximum of 20000 heads of broilers per cycle |
Lot 3C Talparo Main Road, Talparo, San Rafael |
CEC ISSUED
05-Jun-2019 |
|
|
5722/2019 |
2019-04-01 |
Pauline St. Louis & Hassan Oronsaye |
1(a) |
the establishment of a poultry farm for the rearing of a maximum of 3000 head of layers for the production and packaging of eggs |
WC 7 Block 3 Wallerfield |
CEC ISSUED
26-Jun-2019 |
|
|
5723/2019 |
2019-04-02 |
Brandon Singh & Annmarie Doyle |
1(a) |
the expansion of an existing poultry farm to include 7,000 heads of broilers to attain a maximum of 21,000 heads per cycle |
#1 Mexico Road Wallerfield |
CEC ISSUED
31-May-2019 |
|
|
5724/2019 |
2019-04-02 |
Yasin Abu-Bakr |
8(a), 9, 33(a), 40(a), 41(a) |
the subdivision of 5.3283ha of land |
Indian Trail, Rivulet Bye Pass Road, Couva |
NO CEC Required
13-May-2019 |
|
|
5725/2019 |
2019-04-02 |
Trinidad Cement Limited (TCL) |
37 |
the modification of a facility for co-processing of used oil for energy recovery in the clinker manufacturing kilns |
Trinidad Cement Limited's Compound, Southern Main Road, Claxton Bay |
CEC Required Letter 19-Oct-2023 |
|
|
5726/2019 |
2019-04-03 |
Steve Balgobin |
1(a),9, 39, 41 |
the expansion of a poultry farm on 2ha of 5.26ha parcel of land for the rearing of an additional 76000 heads of broilers per cycle for a maximum capacity of 106000 heads of broilers per cycle |
6-7 Seebalack Trail, Rochard Road |
Withdrawal Letter 29-December-2023 |
|
|
5727/2019 |
2019-04-04 |
Mangal Gosyne |
1(a) |
the expansion of an existing poultry farm for the rearing of an additional 10000 broilers through establishment of two additional pens to attain a maximum of 49000 broilers per cycle |
Lot #4 Heights of Guanapo Road, Wallerfield, Arima |
Ack./F.I.
15-Apr-2019 |
|
|
5728/2019 |
2019-04-04 |
Two Monkeys Brewing Company Ltd. |
17 |
the establishment of a micro-brewery for the manufacture of craft beer |
LP 55 O'Meara Ferry Road, Carapo Village, Arima |
CEC ISSUED
15-Jul-2019 |
|
|
5729/2019 |
2019-04-04 |
Dalip Jairam |
34 |
the operation of a facility for the construction of fibreglass boats |
Spencer Avenue, Barrackpore |
Letter to TCPD 14-Dec-2022 |
|
|
5730/2019 |
2019-04-05 |
Churkoo Transport Services Ltd. |
23 |
the operation of an existing facility for the storage of sand, gravel and other non-metallic minerals |
L.P #19 Manzanilla Mayaro Road, Mayaro |
Sta. Update L.
28-Dec-2021
Clarification Letter
12-Jul-2019 |
|
|