5670/2019 |
2019-02-04 |
National Infrastructure
Development Company Limited |
10 (a), 32, 40 (a), 41 (a) & (b), 42 |
the establishment of an airport terminal building, airside infrustructure, car park facility and upgrade to existing terminal of the ANR Robinson International Airport |
St. Patrick County, Crown Point, Tobago |
CEC ISSUED
23-Apr-2021 |
|
|
5671/2019 |
2019-02-05 |
Sarah Gopaul |
1 (b) |
the establishment of a poultry farm for the rearing of a maximum of 3000 heads of layers for egg production |
# 36 F Thomas Trace Los Iros Road Erin |
CEC ISSUED
01-Apr-2019 |
|
|
5672/2019 |
2019-02-05 |
Erin Farm Limited and
Erin Meat Packers Ltd |
39 |
the construction of an additional settling pond |
7-11 Farm Road, St. Francis Village, Erin |
CEC ISSUED
26-Apr-2019 |
|
|
5673/2019 |
2019-02-05 |
Lake Asphalt of Trinidad and Tobago (1978) Limited |
18(b), 23 |
to continue with the ongoing mining and processing of asphalt from the Pitch Lake |
Brighton, La Brea |
CEC ISSUED 24-Apr-2023 |
|
|
5674/2019 |
2019-02-05 |
WASA c/o Roger Karim |
40 (b) |
the installation of 4.753km of 200mm PVC pipline f and its appurtenances including bridge and culvert crossings, and road reinstatement |
from Oropuche Junction, Along South Oropouche Main Road, Avcat Main Road and Siparia Old Road to LP 150 St. John's Village Avocat |
CEC ISSUED
21-Jun-2019 |
|
|
5675/2019 |
2019-02-06 |
Zion Cooper |
1 (a) |
the establishment of a poultry farm for the rearing of a maximum of 16,000 broilers on 1.21 hectares of land |
# 27 A Congo Trace, Penal Rock Road, Penal |
CEC ISSUED
23-Apr-2019 |
|
|
5676/2019 |
2019-02-08 |
RPN Enterprises limited |
8 (a), 9, 40(a), 41(a), 42 |
the establishment of infrastructure to facilitate a residential development on 16 hectares of land |
Lopinot Road, Lopinot |
Status Update L.
09-Sep-2021
Gen. Letter
25-Mar-2019 |
|
|
5677/2019 |
2019-02-08 |
MORDLG c/o Jessie Boissiere, C.E.P Ltd. |
8 (a), 9, 40(a), 41(a), |
the construction of Diego Martin Regional Corporation Administrative Complex on 2.0237 hectares of land |
at the corner of Western Main Road and Diego Martin Highway |
CEC ISSUED
17-Apr-2019 |
|
|
5678/2019 |
2019-02-08 |
WASA c/o Roger Karim |
38(b) |
drilling, developing and equipping of the Granwood Well #2 for production status and the establishment of 0.3km of a 150mm transmission pipeline and its appurtenances |
3rd Avenue off Western Main Road Chaguaramas |
CEC ISSUED
07-May-2019 |
|
|
5679/2019 |
2019-02-08 |
Wendy Phillip |
1 (a) |
establishment of a poultry farm to rear 10000-15000 broilers per cycle |
Dades Road, Rio Claro |
Ack./F.I.
22-Feb-2019 |
|
|