EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

EIA Summary

  • Toggle
    • EIA Summary
    • CEC
    • APPLICANT
    • CONSULTANT
    • DESCRIPTION
  • Group by
    • None
    • CEC
    • APPLICANT
    • CONSULTANT
    • DESCRIPTION
  • Clear filters
  • Advanced search
CEC APPLICANT CONSULTANT DESCRIPTION
Page 11 of 20
  • Start
  • Prev
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • Next
  • End
To develop the Mango site by the installation of a Mango Well Protection Platform (WPP), the 26inch multiphase pipeline and the drilling of wells at South East Galeota Block.(1)
No records
1167 / 2005 BP Trinidad and Tobago LLC. (BPTT) Environmental Sciences Ltd. To develop the Mango site by the installation of a Mango Well Protection Platform (WPP), the 26inch multiphase pipeline and the drilling of wells at South East Galeota Block.
View
Construction of a 36-inch pipeline at Point Lisas.(1)
No records
1162 / 2005 The National Gas Company of Trinidad & Tobago Ltd. of Trinidad and Tobago (NGC), Ecoengineering Consultant Ltd. Construction of a 36-inch pipeline at Point Lisas.
View
The construction of an ammonia production plant with a capacity of 1,850 MTPD at Point Lisas.(1)
No records
1159 / 2005 Methanol Holdings (Trinidad) Ltd. (MHTL) Ecoengineering Consultant Ltd. The construction of an ammonia production plant with a capacity of 1,850 MTPD at Point Lisas.
View
Extension of a highway at Golconda, Diamond and Debe.(1)
No records
1143 / 2005 Ministry of Works and Transport, Programme Implementation unit, Highways Division,, Ecoengineering Consultant Ltd. Extension of a highway at Golconda, Diamond and Debe.
View
A drainage and flood control project for the protection of the Borough of Chaguanas, the towns from Chaguanas to Mamoral along the CaparoValley.(1)
No records
1126 / 2005 Ministry of Works and Tansport. Drainage Division. *Royal Haskoning-Netherlands&UK and *Haskoning Caribbean Ltd. A drainage and flood control project for the protection of the Borough of Chaguanas, the towns from Chaguanas to Mamoral along the CaparoValley.
View
To drill thirty seven (37) wells at Penal, Barrackpore and Wilson(1)
No records
1125 / 2005 Petroleum Company of Trinidad and Tobago Ltd, Petrotrin, HSE Department To drill thirty seven (37) wells at Penal, Barrackpore and Wilson
View
To conduct land development activities, for the construction of a highway, from San Fernando to PrincessTown.(1)
No records
1121/ 2005 Ministry of Works and Transportation. Programmes Implementation Unit, To conduct land development activities, for the construction of a highway, from San Fernando to PrincessTown.
View
To drill five (5) replacement oil wells in the Barrackpore and Sunty Fields.(1)
No records
1061 / 2005 Primera Oil and Gas Ltd. Environmental Sciences Ltd. To drill five (5) replacement oil wells in the Barrackpore and Sunty Fields.
View
To conduct exploration activities, for crude oil and natural gas in Block WD-15, Los Charros Road, Palo Seco, County St. Patrick.(1)
No records
1038 / 2005 Rocky Point Trinidad and Tobago Ltd. Environmental Sciences Ltd. To conduct exploration activities, for crude oil and natural gas in Block WD-15, Los Charros Road, Palo Seco, County St. Patrick.
View
To construct an Aluminium smelting facility at UnionVillage, la Brea.(1)
No records
1033 / 2005 Alutrint Ltd. -   Foster Solutions for Sustainable Ecosystem Development Ltd. To construct an Aluminium smelting facility at UnionVillage, la Brea.
View
  • You are here:  
  • Home
  • EIA Summary

Back to Top

© 2023 EMA E-Summary