1167 / 2005 |
BP Trinidad and Tobago LLC. (BPTT) |
Environmental Sciences Ltd. |
To develop the Mango site by the installation of a Mango Well Protection Platform (WPP), the 26inch multiphase pipeline and the drilling of wells at South East Galeota Block. |
|
|
1061 / 2005 |
Primera Oil and Gas Ltd. |
Environmental Sciences Ltd. |
To drill five (5) replacement oil wells in the Barrackpore and Sunty Fields. |
|
|
1038 / 2005 |
Rocky Point Trinidad and Tobago Ltd. |
Environmental Sciences Ltd. |
To conduct exploration activities, for crude oil and natural gas in Block WD-15, Los Charros Road, Palo Seco, County St. Patrick. |
|
|
No records
|
1162 / 2005 |
The National Gas Company of Trinidad & Tobago Ltd. of Trinidad and Tobago (NGC), |
Ecoengineering Consultant Ltd. |
Construction of a 36-inch pipeline at Point Lisas. |
|
|
1159 / 2005 |
Methanol Holdings (Trinidad) Ltd. (MHTL) |
Ecoengineering Consultant Ltd. |
The construction of an ammonia production plant with a capacity of 1,850 MTPD at Point Lisas. |
|
|
1143 / 2005 |
Ministry of Works and Transport, Programme Implementation unit, Highways Division,, |
Ecoengineering Consultant Ltd. |
Extension of a highway at Golconda, Diamond and Debe. |
|
|